Staff Report to Council
Application No.: 7923-0037-00
Planning & Development Report
Page 4
Planning Considerations
•
The applicant is proposing a Development Permit to construct two multi-unit industrial
buildings. Development details are provided in the following table:
Proposed
Lot Area
Gross Site Area:
15,721 square metres
Net Site Area:
15,721 square metres
Number of Lots:
1
Building Height
10.73 metres
Floor Area Ratio
0.64
Floor Area
South Building
North Building
Total
Industrial:
1,818 sq. m.
1,944 sq. m.
3,762 sq. m.
Office:
789 sq. m.
789 sq. m.
1,578 sq. m.
Total
2,607 sq. m.
2,733 sq. m.
5,340 sq. m.
Referrals
Engineering:
The Engineering Department has no objection to the project
subject to the completion of Engineering servicing requirements as
outlined in Appendix II.
Surrey Fire Department:
No Concerns.
Advisory Design Panel
The application is not subject to review by the ADP but was
reviewed by staff and found to be satisfactory
Transportation Considerations
•
As there is no rezoning associated with this application, no dedication is required. However,
there is a special setback required along 76 Avenue, as per Part 7 of the Surrey Zoning By-law,
as amended. Structures will be required to be set back an additional 2.442 metres to meet the
special setbacks as detailed in Schedule K of the Surrey Subdivision and Development By-law,
as amended. The Zoning Bylaw specifies that all setbacks shall be taken from the ultimate
road allowance (the special setback), rather than the property line.
•
The applicant proposes one access point from 76 Avenue.
•
An internal 7.5-metre-wide drive-aisle running north to south through the property will
provide loading and fire access to the front of all the industrial units.
•
The site is approximately 20 metres away from an existing bus stop. The stop provides bus
service between Newton Exchange and Surrey Central.
•
There is an bike lane fronting the property which runs along 76 Avenue.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:451e230d0419f6eeee609987365868e1cf004722c164049d732bb291d12f3992
文本 SHA-256:93f358ae3cc7966c8c3e27916f8c49cb5f41f44ee374899a8bc80c5991520b8f
抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 3165–5236(末端不含)