Surrey 2026-04-27 市议会土地使用会议
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
It was
Moved by Councillor Hepner
Seconded by Councillor Stutt
That:
1.
a Bylaw be introduced to rezone the subject site from Urban Residential
Zone (R3) to Neighbourhood Commercial Zone (C-5), and a date be set for
Public Hearing.
2.
Council authorize staff to draft Development Permit No. 7917-0602-00
generally in accordance with the attached drawings (Appendix A).
3.
Council endorse Development Variance Permit No. 7917-0602-00, varying
the following in the Zoning By-law, to proceed to Public Notification and
bring the Development Variance Permit forward for an indication of
support by Council. If supported, the Development Variance Permit will be
brought forward for issuance and execution by the Mayor and City Clerk in
conjunction with the final adoption of the associated rezoning bylaw.
(a)
in Section B.1 Streamside Setback Areas of Part 7A Streamside
Protection, reduce the minimum setback distance for a Class A stream
from 30 metres to 7.7 metres as measured from the top of bank;
(b)
in Section F. "Yards and Setbacks" of Part 35 Neighbourhood
Commercial Zone (C-5), reduce side yard (south) and
front yard (east) setbacks from 7.5 metres to 3 metres; and
(c)
in Section G. "Height of Buildings" of Part 35 Neighbourhood
Commercial Zone (C-5), increase the maximum building height
allowed from 9 metres to 10 metres.
4.
Council instruct staff to resolve the following issues prior to final approval:
(a)
resolution of all engineering requirements to the satisfaction of the
General Manager, Engineering (Appendix C);
(b)
submission of a subdivision layout to the satisfaction of the
Approving Officer;
(c)
submission and acceptance of finalized architectural drawings,
including resolution of all urban design issues, to the satisfaction of
the Planning and Development Department;
(d)
submission and acceptance of finalized landscaping drawings,
including resolution of all landscape design issues, compliance with
the landscaping and screening requirements of the C-5 Zone, and a
Regular Council - Land Use Minutes
April 27, 2026
Page 12
landscaping cost estimate to the satisfaction of the Planning and
Development Department;
(e)
submission and acceptance of a finalized arborist report, including
satisfying the required tree replacement, to the satisfaction of the
Planning and Development Department;
(f)
submission and acceptance of a finalized Ecosystem Development
Plan and Impact Mitigation Plan to the satisfaction of the
Planning and Development Department;
(g)
submission and acceptance of a finalized Geotechnical Report to
the satisfaction of City staff;
(h)
demolition of existing buildings and structures to the satisfaction of
the Planning and Development Department;
(i)
registration of a statutory right-of-way for public rights-of-passage
for the publicly accessible open space (corner plaza) within the site
and walkway between buildings; and
(j)
registration of a Section 219 Restrictive Covenant to adequately
address the City’s needs with respect to public art, to the
satisfaction of the General Manager, Parks, Recreation and Culture
and with respect to the City’s Affordable Housing Strategy and
Tier 1 Capital Project CACs, to the satisfaction of the
General Manager, Planning & Development.
RES.R26-943
Carried
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:e2781870279dcb3e895d8f59e8ed5046606d7752a448510bdc90c40069c06354
文本 SHA-256:275f8e34741906234103b0b2cd23e577cf1761beece9c230b307d934a475a0ed
抽取:pymupdf-1.26.7-text-pages-v1
第 11–12 页;字符 20544–23932(末端不含)