MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 11 页

Surrey 2026-04-27 市议会土地使用会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

It was Moved by Councillor Hepner Seconded by Councillor Stutt That: 1. a Bylaw be introduced to rezone the subject site from Urban Residential Zone (R3) to Neighbourhood Commercial Zone (C-5), and a date be set for Public Hearing. 2. Council authorize staff to draft Development Permit No. 7917-0602-00 generally in accordance with the attached drawings (Appendix A). 3. Council endorse Development Variance Permit No. 7917-0602-00, varying the following in the Zoning By-law, to proceed to Public Notification and bring the Development Variance Permit forward for an indication of support by Council. If supported, the Development Variance Permit will be brought forward for issuance and execution by the Mayor and City Clerk in conjunction with the final adoption of the associated rezoning bylaw. (a) in Section B.1 Streamside Setback Areas of Part 7A Streamside Protection, reduce the minimum setback distance for a Class A stream from 30 metres to 7.7 metres as measured from the top of bank; (b) in Section F. "Yards and Setbacks" of Part 35 Neighbourhood Commercial Zone (C-5), reduce side yard (south) and front yard (east) setbacks from 7.5 metres to 3 metres; and (c) in Section G. "Height of Buildings" of Part 35 Neighbourhood Commercial Zone (C-5), increase the maximum building height allowed from 9 metres to 10 metres. 4. Council instruct staff to resolve the following issues prior to final approval: (a) resolution of all engineering requirements to the satisfaction of the General Manager, Engineering (Appendix C); (b) submission of a subdivision layout to the satisfaction of the Approving Officer; (c) submission and acceptance of finalized architectural drawings, including resolution of all urban design issues, to the satisfaction of the Planning and Development Department; (d) submission and acceptance of finalized landscaping drawings, including resolution of all landscape design issues, compliance with the landscaping and screening requirements of the C-5 Zone, and a Regular Council - Land Use Minutes April 27, 2026 Page 12 landscaping cost estimate to the satisfaction of the Planning and Development Department; (e) submission and acceptance of a finalized arborist report, including satisfying the required tree replacement, to the satisfaction of the Planning and Development Department; (f) submission and acceptance of a finalized Ecosystem Development Plan and Impact Mitigation Plan to the satisfaction of the Planning and Development Department; (g) submission and acceptance of a finalized Geotechnical Report to the satisfaction of City staff; (h) demolition of existing buildings and structures to the satisfaction of the Planning and Development Department; (i) registration of a statutory right-of-way for public rights-of-passage for the publicly accessible open space (corner plaza) within the site and walkway between buildings; and (j) registration of a Section 219 Restrictive Covenant to adequately address the City’s needs with respect to public art, to the satisfaction of the General Manager, Parks, Recreation and Culture and with respect to the City’s Affordable Housing Strategy and Tier 1 Capital Project CACs, to the satisfaction of the General Manager, Planning & Development. RES.R26-943 Carried

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:e2781870279dcb3e895d8f59e8ed5046606d7752a448510bdc90c40069c06354

文本 SHA-256:275f8e34741906234103b0b2cd23e577cf1761beece9c230b307d934a475a0ed

抽取:pymupdf-1.26.7-text-pages-v1
第 11–12 页;字符 20544–23932(末端不含)