MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 6 页

Surrey planning report 7922-0129-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0129-00 Planning & Development Report Page 6 Referrals Engineering: The Engineering Department has concerns in permitting piecemeal applications and densification without addressing neighbourhood- wide servicing constraints. School District: The School District has advised that there will be approximately 142 school-age children generated by this development, of which the School District has provided the following expected student enrollment. 73 Elementary students at Chantrell Creek Elementary School 45 Secondary students at Elgin Park Secondary School (Appendix II) The School District advises that current student projections and school capacities do not factor unplanned major increases in density as this development proposes. For example, the projected 73 elementary students would result in Chantrell Creek Elementary School being over-capacity at a number that the District has not anticipated until beyond 2033, their 10 year planning horizon. Therefore, the District has raised concerns regarding the proposal with regard to its potential impact on school capacities and precedent setting prior to a neighbourhood policy planning process. Parks, Recreation & Culture: The proposed park locations are not supported by Parks. Should Council refer the application back to staff, the Parks, Recreation and Culture Department will review further the park provision needs and locations within the development area. Transportation Considerations • 24 Avenue is an arterial road. At this location, it has one travel lane in each direction, and a left-turn bay for left-in access to Elgin Park Secondary School. Currently there are no road improvements within the City’s Ten Year Plan (2023-2032) planned for the section of 24 Avenue fronting the subject site. • If the subject application were to proceed, typical road dedication and frontage construction requirements would be applicable. These are not limited to, but would include: o Dedication along 24 Avenue to achieve 12 metres from centreline and frontage construction; o Dedication along 132 Street to achieve 12 metres from centerline and frontage construction; o Dedication along 136 Street to achieve 12 metres from centreline and frontage construction; o Dedication and construction of any new proposed roads; and o Dedication and construction of any new proposed Lanes.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:754028d353963c74c8136a475ac7eb64e6f6fd2a540b731cabfd7bc516809857

文本 SHA-256:8e6d7076c11edbd0da5bfff54a554920e6a344b1af29d2153daf429a65d3327a

抽取:pymupdf-1.26.7-text-pages-v1
第 6–6 页;字符 9562–12039(末端不含)