MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 6 页

Surrey 2023-09-25 市议会土地使用会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

2. Council authorize staff to draft Development Permit No. 7921-0057-00 generally in accordance with the attached drawings (Appendix I), and the finalized Ecosystem Development Plan and geotechnical report. 3. Council approve Development Variance Permit No. 7921-0057-00, varying the following, to proceed to Public Notification: (a) to reduce the minimum north side yard setback of the RM-30 Zone from 6 metres to 3 metres to the principal building face of Buildings 4 and 5, to 2.2 metres for Building 7, and to 2.0 metres to the electrical kiosk; and (b) to reduce the minimum south side yard flanking street setback of the RM-30 Zone from 4.5 metres to 3.3 metres to the principal building face of Building 3. 4. Council instruct staff to resolve the following issues prior to final adoption: (a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering; (b) Approval from the Ministry of Transportation & Infrastructure; (c) resolution of all urban design issues to the satisfaction of the Planning and Development Department; (d) submission of a finalized landscaping plan and landscaping cost estimate to the specifications and satisfaction of the Planning and Development Department; (e) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; (f) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department; (g) submission of a finalized Ecosystem Development Plan to the satisfaction of City staff; (h) submission of a finalized Geotechnical Report to the satisfaction of City staff; (i) the applicant provide a density bonus amenity contribution consistent with the Tier 2 Capital Projects CACs in support of the requested increased density, to the satisfaction of the General Manager, Planning and Development Department; (j) demolition of existing buildings and structures to the satisfaction of the Planning and Development Department;

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:cb08cbabd47f51037b164799b16b8889063429e37c528f490ec08fc204aa098e

文本 SHA-256:809ffc91a2e5b83143fbaf8fd857cc458c2a31a29de0d75533e76ce6590c69dd

抽取:pymupdf-1.26.7-text-pages-v1
第 6–6 页;字符 9531–11758(末端不含)