MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 7 页

Surrey 7920-0289-00 original planning report

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

The Arborist Assessment states that there are a total of 106 mature trees on the site, excluding Alder and Cottonwood trees. It was determined that 36 trees can be retained as part of this development proposal. The proposed tree retention was assessed taking into consideration the location of services, building footprints, road dedication and proposed lot grading. • For those trees that cannot be retained, the applicant will be required to plant trees on a 2 to 1 replacement ratio. This will require a total of 140 replacement trees on the site. Since only 10 replacement trees can be accommodated on the site, the deficit of 130 replacement trees will require a cash-in-lieu payment of $52,000, representing $400 per tree, to the Green City Program, in accordance with the City’s Tree Protection By-law. • In summary, a total of 46 trees are proposed to be retained or replaced on the site with a contribution of $52,000 to the Green City Program.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:318ba48cecaddaaafbdbfb0fa8d9f324b290569209b610e24b0085c075f31e1b

文本 SHA-256:fd8fcd84e64f325b4404eec4ce64a03cd8093de4c35d664cc6f2f9249cb439c9

抽取:pymupdf-1.26.7-text-pages-v1
第 7–7 页;字符 10850–11821(末端不含)