TransLink 2026 Cost-Share Funding Applications – Transportation Projects
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
November 18, 2025
- 3 -
The projects for cost-sharing considerations are described below.
Projects for the 2026 TransLink Cost-Share Programs
The following projects have been submitted to TransLink for consideration in the 2026
infrastructure cost-share funding programs. Collectively, these projects will utilize TransLink's
allocated funding for the City of Richmond, which is estimated at approximately $4.1 million for
2026.
Major Road Network and Bike (MRNB) Upgrade Program (allocated)
TransLink's estimated 2026 allocation for Richmond is $2,389,000 for the MRNB Program. The
following projects have been submitted for consideration:
•
(Pro;ect # 1) Steveston Highway Multi-Use Pathway (MUP) Phase 3 - Additional Scope
(Shell Road to Highway 99 Interchange): This project includes provision of a multi-use
pathway along the south side of Steveston Highway from Shell Road to the Highway 99
Interchange. The project will complete a one-kilometre gap in the cycling network along
Steveston Highway by extending the existing Steveston Highway MUP east of Shell
Road. Upon completion, users will be able to connect from the Railway Greenway to the
new cycling facilities on the Steveston Interchange, the future Fraser River Tunnel and
the existing bike lanes to the Riverport.
•
(Pro;ect #2) River Road Cycling Enhancements (No. 2 Road to Lynas Lane): As part of
dike upgrades between No. 2 Road and Lynas Lane on River Drive, this project allows
for a dedicated and separated cycling facility to be initiated which will support
enhancement along TransLink's Major Bikeway Network.
•
(Pro;ect #3) Westminster Highway and No. 4 Road Intersection Upgrade: This
intersection is ranked #7 of the City's Top 20 Collision Prone Intersections report.
Upgrades include increasing left-tum safety and capacity along with pedestrian and
cycling facility upgrades.
•
(Pro;ect #4) Alderbridge Way and No. 4 Road Intersection Safety Improvements: This
intersection is ranked #4 of the City's Top 20 Collision Prone Intersections report.
Upgrades include improving left-turn safety, removing channelized right-turn islands and
pedestrian facility upgrades.
Bicycle Infrastructure Capital Cost-Sharing (BICCS) Program (allocated)
TransLink's 2026 estimated allocation for Richmond is $1,313,000 for the BICCS Program.
The following projects have been submitted for consideration for the allocated component:
•
(Pro;ect #1) Steveston Highway Multi-Use Pathway Phase 3 -Additional Scope: As
described above for the MRNB Program.
8180311
PWT - 12
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:f6052ea39e73191df7c5c35b9aaabbbae6b68eb0ab97eaded0e699794ff5385b
文本 SHA-256:c2628cba8237974acbcc09f9571127379782e0d0b4894ddec4d7289cd5ce1d37
抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 3370–5943(末端不含)