Surrey planning report 7922-0191-00
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
APRON
LIGHT DUTY ASPHALT
HEAVY DUTY ASPHALT
SITE MATERIAL LEGEND
MULCH
LANDSCAPING
SIDEWALK
HARD LANDSCAPING
DECORATIVE PAVING
SITE PLAN LEGEND
PROPERTY LINE
SETBACK LINE
RIGHT OF WAY LINE
PROPOSED BUILDING
FENCE
MAN DOOR
OVERHEAD DOOR
BARRIER FREE
ENTRANCE
RIGHT OF WAY HATCH
https://bit.ly/3xcf4So
BYLAW INFORMATION
ZONING:
PRESENT ZONING:
A-2 INTENSIVE AGRICULTURAL ZONE
PROPOSED ZONING:
CD COMPREHENSIVE DEVELOPMENT ZONE
SETBACKS
FRONT YARD (S):
PROVIDED: 19.4 m
REQUIRED: 16.0 m
REAR YARD (N):
PROVIDED: 4.6 m
REQUIRED: 7.5 m
SIDE YARD (E):
PROVIDED: 19.4 m
REQUIRED: 9.0 m
SIDE YARD (W):
PROVIDED: 13.8m
REQUIRED: 9.0 m
SITE SIZE:
104,627.38 m² (1,126,199.72 ft²)(25.9 acre)
BUILDING AREAS:
SITE COVERAGE:
PROVIDED: 62.9%
MAX: 60%
BUILDING HEIGHT:
PROVIDED: 13.32m (43'-8 1/4")
MAX: 14m (46 ft)
LOADING DOCKS:
BUILDING 1: 36
BUILDING 2: 68
BUILDING 1
22,598.7 m²
(243,251 ft²)
BUILDING 2
43,249.2 m²
(465,530 ft²)
11.6%
37.43 m
130.45 m
19.40 m
RETAIL NODE
BELOW
A103
1
A102
1
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT
LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT
LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
APPROX. FIRE
HYDRANT
LOCATION
(T.B.C.)
ROOFTOP PARKING ACCESS
ROOFTOP PARKING
ROOFTOP PARKING
ROOFTOP PARKING
7.92 m
176.48 m
43.61 m
129.54 m
20.31 m
ROOFTOP PARKING ACCESS
/
4 A107
/
5 A107
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
/
6 A108
ROOFTOP PARKING
APPROX. FIRE
HYDRANT LOCATION
(T.B.C.)
/
3 A108
/
2 A108
3.0%
3.0%
11.4%
5.0%
5.0%
5.0%
FIRELANE
6.00 m
35.67 m
36.17 m
37.96 m
28 AVENUE
190 STREET
192 STREET
30 AVENUE
ADJACENT PROPERTY
ADJACENT PROPERTY
192 STREET
SETBACK
7.50 m
SETBACK
9.00 m
SETBACK
9.00 m
SETBACK
9.00 m
SETBACK
7.50 m
89° 50' 06"
185.06 m
357° 03' 46"
6.91 m
354° 45' 33"
21.46 m
357° 10' 04"
11.27 m
359° 27' 43"
141.45 m
314° 41' 48"
8.52 m
179° 25' 26"
362.97 m
359° 14' 57"
190.35 m
62.26 m
9.00 m
220.86 m
9.00 m
68.85 m
80.10 m
9.00 m
81.07 m
11.00 m
96.63 m
11.00 m
86.14 m
13.78 m
334.98 m
21.21 m
168.82 m
11.00 m
7.99 m
37.39 m
128.93 m
19.35 m
5.0%
3.0%
SETBACK
7.50 m
SETBACK
7.50 m
269° 55' 52"
357.92 m
224° 53' 49"
8.48 m
89° 40' 40"
54.03 m
94° 12' 47"
44.20 m
89° 41' 03"
42.23 m
89° 40' 43"
41.54 m
134° 33' 03"
8.50 m
GARBAGE
ENCLOSURE
36.31 m
SETBACK
16.00 m
R 12.0 m
FIRELANE
6.00 m
190 St.
28 Ave.
192 St.
190 St.
192 St.
194 St.
188 St.
28 Ave.
30 Ave.
28 Ave.
BUILDING 1
BUILDING 2
PARKING CALCULATION
BUILDING
USE
AREA
PARKING BY GROSS FLOOR AREA
ft²
m²
REQUIREMENT
REQUIRED
BUILDING 1
MAIN
OFFICE
10,992.97
1,021.3
2.5 STALL PER
100
m²
25.53
MAIN
WAREHOUSE 222,118.14
20,635.5
1 STALL PER
100
m²
206.35
2nd FLOOR
OFFICE
10,229.28
950.3
2.5 STALL PER
100
m²
23.76
255.64
BUILDING 2
MAIN
OFFICE
19,740.35
1,833.9
2.5 STALL PER
100
m²
45.85
MAIN
RETAIL
9,848.96
915.0
3 STALL PER
100
m²
27.45
MAIN
WAREHOUSE 421,939.70
39,199.5
1 STALL PER
100
m²
391.99
2nd FLOOR
RETAIL
11,675.49
1,084.7
3 STALL PER
100
m²
32.54
2nd FLOOR
OFFICE
18,963.55
1,761.8
2.5 STALL PER
100
m²
44.04
541.88
SUBTOTAL
725,508.44
67,401.9
TOTAL PARKING STALLS REQUIRED
797.52
ACCESSIBLE PARKING STALL REQUIREMENTS
REQUIRED NUMBER OF ACCESSIBLE PARKING
SPACES BASED OFF OF REQUIRED NUMBER
OF STANDARD PARKING SPACE
STANDARD STALLS
REQUIREMENT
REQUIRED
797.52
2%
0.02
15.95
TOTAL VEHICLE PARKING STALLS REQUIRED:
798
BICYCLE PARKING REQUIREMENTS
BUILDING
TYPE OF STALL
AREA
PARKING BY GROSS FLOOR AREA
ft²
m²
REQUIREMENT
REQUIRED
GENERAL SERVICE
USE AND EATING
ESTABLISHMENT
SECURE BIKE STALLS
725,508.44
67,401.9
0.06 SPACE PER 100
m²
40.44
VISITOR BIKE STALLS
725,508.44
67,401.9
0.06 SPACE PER 100
m²
40.44
80.88
TOTAL BIKE SPACES REQUIRED
81
SECURE BIKE STALLS TO BE PROVIDED IN FUTURE TENANT IMPROVEMENT STAGE.
EV PARKING STALL REQUIREMENTS
COMMERCIAL
AREA (OFFICE &
RETAIL)
BUILDING
COMMERCIAL STALLS
REQUIREMENT
REQUIRED
BUILDING 1
49.29
20%
9.86
BUILDING 2
149.88
20%
29.98
39.83
TOTAL EV STALLS REQUIRED
40
Stamp:
(403) 885-5525 P.O. BOX 1690
BLACKFALDS, AB, T0M 0J0
Date:
Drawn by:
Checked by:
Sheet No:
Sheet Name:
Project No:
DO NOT SCALE DRAWING - VERIFY ALL DIMENSIONS, DATUMS AND LEVELS PRIOR TO COMMENCEMENT OF WORK. REPORT ANY DISCREPANCIES OR OMISSIONS TO THE ARCHITECT IMMEDIATELY. ALL WORK MUST COMPLY WITH THE MOST RECENT EDITION OF THE APPLICABLE BUILDING CODE AND ANY OTHER GOVERNING AUTHORITIES. THIS IS A COPYRIGHT DRAWING AND SHALL NOT BE REPRODUCED OR REVISED WITHOUT THE WRITTEN CONSENT OF THE CONSULTANT.
Architect:
\\EBDRAFTING1\Drafting\H\Heppell, Mike\190th Street - Heppell Property (B21028)\Model\Site\190th Street Heppell Property - Site.rvt
2023-02-07
8:49:09 AM
Site Plan
Overall
A101
190th Street Heppell Property
2898 190 Street and 2981 & 2825 192 Street
Surrey, British Columbia
Office Warehouse & CRU’s
AQ/EA/LH
DE, LB, RO, OB
B21028
NOTES CONCERNING BUILDING LOCATION
1.
THIS SITE PLAN IS BASED ON INFORMATION PROVIDED BY THE OWNER, AND NOT A SURVEY OR
ACTUAL SITE MEASUREMENTS. ENGINEER IS TO BE ADVISED BEFORE START OF CONSTRUCTION OF
ANY UN-KNOWN FEATURES ON THIS OR THE ADJACENT SITES THAT MIGHT IMPACT ON THE PROJECT
EITHER DURING CONSTRUCTION OR FUTURE USE.
2.
THE "NORTH" ORIENTATION REFERS TO NOMINAL NORTH RATHER THAN TRUE OR MAGNETIC NORTH.
3.
ANY DIMENSIONS THAT SHOW THE LOCATION OF EXISTING FEATURES ARE APPROXIMATE ONLY, AND
ARE TO BE CONFIRMED BEFORE CONSTRUCTION START AS REQUIRED BY A CERTIFIED ALBERTA
LAND SURVEYOR.
SITE SCHEDULE
ON SITE
APRON
18,976.53 ft²
1,763.0 m²
DECORATIVE PAVING
10,876.57 ft²
1,010.5 m²
HARD LANDSCAPING
788.12 ft²
73.2 m²
HEAVY DUTY ASPHALT
242,749.16 ft²
22,552.1 m²
LANDSCAPING
67,717.89 ft²
6,291.2 m²
LIGHT DUTY ASPHALT
39,233.01 ft²
3,644.9 m²
MULCH
4,396.57 ft²
408.5 m²
SIDEWALK
28,544.45 ft²
2,651.9 m²
413,282.32 ft²
38,395.2 m²
OFF SITE
HEAVY DUTY ASPHALT - BOULEVARD
8,399.85 ft²
780.4 m²
LANDSCAPING - BOULEVARD
48,070.97 ft²
4,465.9 m²
SIDEWALK - BOULEVARD
37,666.08 ft²
3,499.3 m²
94,136.89 ft²
8,745.6 m²
Grand total
507,419.21 ft²
47,140.8 m²
1 : 1000
A101
Site Plan
1
PARKING SCHEDULE
BUILDING 1 BARRIER FREE PARKING STALL GROUND PARKING
6
BUILDING 1 STANDARD PARKING STALL
GROUND PARKING
53
BUILDING 1 BARRIER FREE PARKING STALL ROOF PARKING
2
BUILDING 1 EV PARKING STALL
ROOF PARKING
10
BUILDING 1 STANDARD PARKING STALL
ROOF PARKING
174
BUILDING 1: 245
BUILDING 2 BARRIER FREE PARKING STALL GROUND PARKING
6
BUILDING 2 STANDARD PARKING STALL
GROUND PARKING
159
BUILDING 2 BARRIER FREE PARKING STALL ROOF PARKING
2
BUILDING 2 EV PARKING STALL
ROOF PARKING
30
BUILDING 2 STANDARD PARKING STALL
ROOF PARKING
345
BUILDING 2: 542
GRAND TOTAL: 787
VISUAL SCALE 1:1000
100m
20m
80m
60m
40m
0m
NO.
DESCRIPTION
DATE
M
ISSUED FOR DEVELOPMENT PERMIT
2022-05-30
N
REISSUED FOR DEVELOPMENT PERMIT
2022-06-02
O
ISSUED FOR REVIEW
2022-06-20
P
ISSUED FOR REVIEW
2022-10-19
Q
ISSUED FOR REVIEW
2022-11-30
R
REISSUED FOR DEVELOPMENT PERMIT
2022-12-07
S
REISSUED FOR DEVELOPMENT PERMIT
2023-02-06
N
1 : 6000
A101
Context Plan
2
BUILDING 1
22598.71 m²
BUILDING 2
43249.19 m²
TOTAL:
65847.90 m²
BICYCLE PARKING
STALL TYPE
BIKE CAPACITY
VISITOR BIKE STALL
46
46
LOADING DOORS
SIZE
TYPE
COUNT
9'x10' OHD
Dock Door
104
16'x16' OHD
Grade Door
6
SCHEDULE A
Proposal to reduce the
industrial parking rate
from 1.0 parking spaces
per 100 square metres
to 0.983 parking spaces
per 100 square metres.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:105b162066869fb37a51995c16d1dd6defbfdbb21329018c6eb41f8a3d05554a
文本 SHA-256:93e7909eaa842012266c63625fee07851bb41451ba684c28b5bc62e6c7c04669
抽取:pymupdf-1.26.7-text-pages-v1
第 64–64 页;字符 218246–225713(末端不含)