MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 11 页

Surrey 7922-0116-00 April 17 2023 planning report

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0116-00 Planning & Development Report Page 11 Also in support of the proposed variance, the applicant is proposing to convey approximately 75% of the site to the City for conservation purposes, without compensation.) o One resident expressed concern with the proposal. (City staff confirmed:  Development Application No. 7922-0116-00 includes a Development Permit for Sensitive Ecosystems (Streamside & Green Infrastructure) and for Hazard Lands (Steep Slopes).  A Qualified Environmental Professional has determined the streamside setback requirements measured from the surveyed top of bank for Townline Creek.  The project QEP conducted a site visit of the property as part of their assessment process. This informed development of the EDP.  A part of the Hazard Land DP requirements, a Geotechnical Report has been prepared by a Professional Geotechnical Engineer for the proposal. The consultant has determined that the development is feasible provided that the recommendations in their report are incorporated into the overall design of the site, including an 8 metre geotechnical setback from top of bank. The report has been peer reviewed and found to be generally acceptable.) o The subject development application was reviewed by the Fleetwood Community Association. The Fleetwood Community Association provided general comments and questions on the proposed development. (City staff confirmed:  The development application includes a variance to the City of Surrey streamside setback requirements, and that an EDP and IMP were provided by the applicant in support of the requested variance;  No variances are being sought to the minimum lot standards for subdivision under the RF-13 Zone;  A P-15 agreement will be required for restoration, monitoring and maintenance of the conveyed aquatic and riparian areas;  WSA Approval is required, as a condition of Final Adoption, in order remove a failed concrete wall and partially collapsed footbridge from the riparian area.) DEVELOPMENT PERMITS Sensitive Ecosystems (Streamside Areas) Development Permit Requirement • The subject property falls within the Sensitive Ecosystems Development Permit Area (DPA) for Streamside Areas in the OCP, given the location of an existing Class A (red-coded) watercourse which flows south to north. The Sensitive Ecosystems (Streamside Areas) Development Permit is required to protect aquatic and terrestrial ecosystems associated with streams from the impacts of development. • In accordance with Part 7A Streamside Protection setbacks of the Zoning By-law, a Class A (red-coded) watercourse requires a minimum streamside setback of 30 metres, as measured from the top of bank. The proposed setbacks do not comply with the requirements outlined in the Zoning By-law. Instead, the applicant is proposing a minimum 20 metres setback at its closest point in order to facilitate subdivision into four single family lots. The proposed variance only applies to the eastern side of the watercourse.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:dd8888df85502ba4b751dccdbc182bed50bc57b586937c6cddf3229c57b75722

文本 SHA-256:241da70d34ae188eb6f0f5852acbf54f85ae5ec75f019d726adc1872ce505622

抽取:pymupdf-1.26.7-text-pages-v1
第 11–11 页;字符 20729–23857(末端不含)