MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 30 页

Surrey 2025-09-15 市议会土地使用会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

It was Moved by Councillor Kooner Seconded by Councillor Stutt That: 1. a Bylaw be introduced to amend the Official Community Plan (OCP) for the following: (a) Figure 3: General Land Use Designations for a portion of the subject site from "Urban" to "Industrial" (Appendix V); (b) Figure 42: Major Employment Areas by adding a portion of the subject site as an Industrial designation (Appendix V); and and a date be set for the Public Hearing. 2. Council determine the opportunities for consultation with persons, organizations and authorities that are considered to be affected by the proposed amendment to the OCP, as described in the Report, to be appropriate to meet the requirement of Section 475 of the Local Government Act. 3. a Bylaw be introduced to amend Official Community Plan Figure 51: Regional Growth Strategy Land Use Designations to amend a portion of the site from General Urban to Industrial (Appendix V), and a date be set for the Public Hearing, and authorize the City Clerk to bring forward the Bylaw for Final Adoption, subject to the Metro Vancouver Board approving Surrey’s amended Regional Context Statement and approving the Regional Growth Strategy amendments. 4. Council authorize staff to refer the application to Metro Vancouver for consideration of the following upon the application receiving Third Reading to amend the Metro Vancouver Regional Growth Strategy (RGS) designation of the site from General Urban to Industrial. Regular Council - Land Use Minutes September 15, 2025 Page 31 5. Council pass a resolution to authorize staff to submit a Regional Context Statement amendment application to Metro Vancouver following the application receiving Third Reading. 6. a Bylaw be introduced to rezone a portion of the subject site as shown as Block A on the attached Survey Plan (Appendix I), from "Urban Residential Zone (R3)" to "Light Impact Industrial Zone (IL)" and Block B on the attached Survey Plan from "Special Industry (I-4) Zone" to "Light Impact Industrial Zone (IL)" and a date be set for Public Hearing. 7. Council authorize staff to draft Development Permit No. 7918-0076-00 generally in accordance with the attached drawings (Appendix II), and the finalized Ecosystem Development Plan. 8. Council approve Development Variance Permit No. 7918-0076-00, varying the following, to proceed to Public Notification: (a) in Section B.1. of Part 7A "Streamside Protection", the by-law is varied to reduce the minimum setback distance for a Class A (red-coded) stream from 25.0-metres to 10-metres, measured from top-of-bank. 9. Council instruct staff to resolve the following issues prior to final adoption: (a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering; (b) submission of a road dedication plan to the satisfaction of the Approving Officer; (c) submission of a finalized landscaping plan and landscaping cost estimate to the specifications and satisfaction of the Planning and Development Department; (d) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; (e) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department; (f) submission of a finalized Ecosystem Development Plan and Impact Mitigation Plan to the satisfaction of City staff; (g) registration of a Section 219 Restrictive Covenant Restriction against conducting repairs, maintenance and/or truck washing as well as refrigerator truck parking; Regular Council - Land Use Minutes September 15, 2025 Page 32 (h) registration of a Section 219 Restrictive Covenant for payment of development cost charges (DCC’s) for the entire developed area identified and constructed as part of the permanent truck parking facility permit when a building permit is obtained on the lot; (i) the applicant address any unauthorized fill on the subject site and obtain fill permits as required. As a condition of obtaining a soil permit, a geotechnical report that addresses drainage and geotechnical concerns, both onsite and offsite may be required; and (j) the applicant address any concerns / requirements that the Ministry of Transportation and Transit (MOTT) may provide while seeking approval from the MOTT. RES.R25-2094 Carried

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:13d2be4996baff7f036159bea75703dd1348a6570ebfdd4335da84a5ed35f1e5

文本 SHA-256:71ade09051531da35233c5b6e343ac6334fea2c5bcb0756ad66912fc603c7caa

抽取:pymupdf-1.26.7-text-pages-v1
第 30–32 页;字符 55977–60583(末端不含)