MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 4 页

Proposed Interim Energy Centre Location at 3760, 3780 Sexsmith Road, and 8651 Cambie Road

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

delay construction of future permanent energy centres, there is a possibility that IEC#8 would remain in place for a longer period of time. High-level design concept renderings are provided in Attachment 3. The footprint ofIEC#8 is expected to take up the majority of the site. Staff anticipate that a development variance permit would be required to address setback and lot coverage requirements for the lot. The fine tuning of the form and character of the building, as well as further design considerations to address any necessary noise mitigation will be completed in the detailed design stage should Council approve the use of the site for IEC#8. Should a development variance permit still be required, Council will be required to consider issuance of the development permit prior to any construction. Based on the initial design, at the full buildout, IEC#8 will be able to provide up to 10.8 MW of heating capacity, and up to 8.2 MW of cooling capacity. Based on this capacity, IEC#8 is estimated to cost $33.5M, including engineering and construction costs. The plant will be built in phases in line with the 'just in time" approach to infrastructure buildout. Investment in IEC#8 will eliminate an estimated $35M of early investment in other infrastructure necessary to service the same developments.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:9904727b8c2fbe9548b4715b8200a655e51ffaf1c08176890aacf1d000cd16a1

文本 SHA-256:23f1c9140b1bfa8d48496f8fa93c26710cc151b36eb8c685a56dc42411221f01

抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 6089–7413(末端不含)