Surrey planning report 7922-0207-00
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Staff Report to Council
Application No.: 7922-0207-00
Planning & Development Report
Page 9
TREES
•
Adrian Szabunio, ISA Certified Arborist of Woodridge Tree Consulting Arborist Ltd. prepared
an Arborist Assessment for the subject property. The table below provides a summary of the
proposed tree retention and removal by tree species:
Table 1: Summary of Proposed Tree Preservation by Tree Species:
Tree Species
Existing
Remove
Retain
Alder and Cottonwood Trees
Alder
1
1
0
Deciduous Trees
(excluding Alder and Cottonwood Trees)
Plum
2
2
0
Cherry
4
4
0
Coniferous Trees
Blue Sprue
1
0
1
Western Red Cedar
9
7
2
Deodar Cedar
1
1
0
Pine
1
1
0
Cypress
2
2
0
Total (excluding Alder and
Cottonwood Trees)
20
17
3
Total Replacement Trees Proposed
(excluding Boulevard Street Trees)
6
Total Retained and Replacement Trees
Proposed
9
Estimated Contribution to the Green City
Program
$15,950
•
The Arborist Assessment states that there are a total of 20 mature trees on the site, excluding
Alder and Cottonwood trees. One existing tree, approximately 4.7 % of the total trees on the
site, is an Alder tree. The applicant proposes to retain 3 trees as part of this development
proposal. The proposed tree retention was assessed taking into consideration the location of
services, building footprints, road dedication and proposed lot grading.
•
For those trees that cannot be retained, the applicant will be required to plant trees on a 1 to 1
replacement ratio for Alder and Cottonwood trees, and a 2 to 1 replacement ratio for all other
trees. This will require a proposed total of 35 replacement trees on the site. Since the
proposed 6 replacement trees can be accommodated on the site (based on an average of 3
trees per lot), the proposed deficit of 29 replacement trees will require an estimated cash-in-
lieu payment of $15,950, representing $550 per tree to the Green City Program, in accordance
with the City’s Tree Protection By-law.
•
In summary, a total of 9 trees are proposed to be retained and replaced on the site with an
estimated contribution of $15,950 to the Green City Program.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:d315f27a260bca611151c764adb282af9cce6ed7db55e1bdab0af48f8857f8f5
文本 SHA-256:3a7c33926774bc8dfd7a92f4360f00194b39ca299d080b0926447a0a8a7e7045
抽取:pymupdf-1.26.7-text-pages-v1
第 25–25 页;字符 34977–37173(末端不含)