Surrey 2024-06-10 市议会土地使用会议
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
It was
Moved by Councillor Bains
Seconded by Councillor Stutt
That:
1.
Council approve Temporary Use Permit No. 7922-0122-00, to proceed to
Public Notification.
2.
Council instruct staff to resolve the following issues prior to final approval:
(a)
ensure that all engineering requirements and issues including
restrictive covenants, dedications, and rights-of-way where
necessary, are addressed to the satisfaction of the General Manager,
Engineering;
(b)
Input from the Ministry of Transportation & Infrastructure;
(c)
input from TransLink;
(d)
submission of a finalized fencing plan and fencing cost estimate to
the specifications and satisfaction of the Planning and
Development Department;
(e)
installation and subsequent inspection and approval of all required
landscape fencing works, to the satisfaction of the General
Manager, Planning & Development;
(f)
submission of financial securities to ensure that the fencing is
maintained over the course of the Temporary Use Permit, to the
satisfaction of the General Manager, Planning & Development;
(g)
removal of all unauthorized structures including fabric tents;
(h)
a Sensitive Ecosystem Development Permit (SEDP) application to
be submitted and subsequently issued for the watercourses
(ditches) along the south and north property lines; and
(i)
the applicant to undertake the necessary work and obtain permits,
as required, for the proposed use of the existing residential building
on the site for office space and washroom facility purposes.
RES.R24-1142
Carried
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:7466155a92f7d14b14e446dd16006dba6f084363978ed0946369c5deabdc687c
文本 SHA-256:842280521bd6d48f0f4f1e1ff58af524c812b8a81bf3b3985a85b5585591de83
抽取:pymupdf-1.26.7-text-pages-v1
第 23–23 页;字符 45177–46766(末端不含)