Surrey 2023-11-20 市议会土地使用会议
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Regular Council - Land Use Minutes
November 20, 2023
Page 12
(e)
submission of a finalized tree survey and a statement regarding tree
preservation to the satisfaction of the City Landscape Architect;
(f)
the applicant satisfy the deficiency in tree replacement on the site,
to the satisfaction of the Planning and Development Department;
(g)
submission of a finalized Ecosystem Development Plan to the
satisfaction of City staff;
(h)
conveyance of riparian areas to the City at no cost to the City;
(i)
submission of a geotechnical peer report and a finalized
geotechnical report to the satisfaction of City staff;
(j)
submission of a Fire Department Site Plan to the satisfaction of City staff;
(k)
the applicant provide a density bonus amenity contribution
consistent with the Tier 2 Capital Projects CACs in support of the
requested increased density, to the satisfaction of the
General Manager, Planning and Development Department;
(l)
provision of cash-in-lieu contribution to satisfy the indoor amenity
space requirement, at the rate in effect at the time of Final Adoption;
(m)
the applicant adequately compensate and/or relocate existing
manufactured home park residents on the subject site, in
accordance with City Policy O-34A, as well as in accordance with
the Manufactured Home Park Tenancy Act;
(n)
once the site is no longer occupied, removal of any existing
buildings and structures to the satisfaction of the Planning and
Development Department;
(o)
the applicant provide a financial security, in an amount acceptable
to the City, to ensure the proposed childcare facility on proposed
Lot 4 is constructed as part of the future phases of development;
(p)
the applicant apply for a Detailed Development Permit for proposed
Lot 4 lot within Development Application No. 7922-0221-00 and for a
Detailed Development Permit for proposed Lot 2 within Development
Application No. 7922-0222-00 subsequent to receiving Third Reading
on the subject application, and to finalize these two Detailed
Development Permits concurrently with finalizing the General
Development Permits;
(q)
acquisition of the central active park site to ensure park amenity is
available for residents;
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:af0eeefef86179cc269abd79012a1183e302b53c7eb03f61108f3350d1d0c34b
文本 SHA-256:0612242de8f1f0799e62299d1f4f6aef09b149acb553de2536c680ede57faa2d
抽取:pymupdf-1.26.7-text-pages-v1
第 12–12 页;字符 21798–24068(末端不含)