MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 12 页

Surrey 2023-11-20 市议会土地使用会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Regular Council - Land Use Minutes November 20, 2023 Page 12 (e) submission of a finalized tree survey and a statement regarding tree preservation to the satisfaction of the City Landscape Architect; (f) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department; (g) submission of a finalized Ecosystem Development Plan to the satisfaction of City staff; (h) conveyance of riparian areas to the City at no cost to the City; (i) submission of a geotechnical peer report and a finalized geotechnical report to the satisfaction of City staff; (j) submission of a Fire Department Site Plan to the satisfaction of City staff; (k) the applicant provide a density bonus amenity contribution consistent with the Tier 2 Capital Projects CACs in support of the requested increased density, to the satisfaction of the General Manager, Planning and Development Department; (l) provision of cash-in-lieu contribution to satisfy the indoor amenity space requirement, at the rate in effect at the time of Final Adoption; (m) the applicant adequately compensate and/or relocate existing manufactured home park residents on the subject site, in accordance with City Policy O-34A, as well as in accordance with the Manufactured Home Park Tenancy Act; (n) once the site is no longer occupied, removal of any existing buildings and structures to the satisfaction of the Planning and Development Department; (o) the applicant provide a financial security, in an amount acceptable to the City, to ensure the proposed childcare facility on proposed Lot 4 is constructed as part of the future phases of development; (p) the applicant apply for a Detailed Development Permit for proposed Lot 4 lot within Development Application No. 7922-0221-00 and for a Detailed Development Permit for proposed Lot 2 within Development Application No. 7922-0222-00 subsequent to receiving Third Reading on the subject application, and to finalize these two Detailed Development Permits concurrently with finalizing the General Development Permits; (q) acquisition of the central active park site to ensure park amenity is available for residents;

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:af0eeefef86179cc269abd79012a1183e302b53c7eb03f61108f3350d1d0c34b

文本 SHA-256:0612242de8f1f0799e62299d1f4f6aef09b149acb553de2536c680ede57faa2d

抽取:pymupdf-1.26.7-text-pages-v1
第 12–12 页;字符 21798–24068(末端不含)