R212(2023-11-27)官方报告检索摘录
这是从网页检索结果留存的官方报告文本摘录。原始 PDF 尚未留存;这里不提供 PDF 图像,哈希对应本站留存摘录。
The School Board expects 12 new school sites, 1 replacement site and 1 site expansion, over the ten-year period, will be required as the result of this growth in the school district and the site acquisitions will be located as presented in Schedule ‘B’; and According to Ministry of Education site standards presented in Schedule ‘B’ these sites will require in total 57 hectares (approx. 140.85 acres). These sites should be purchased within ten years and serviced land cost is estimated at $602,360,000.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:4439141a28eb85f9912c8a9e2145609454a33cae43bb7d9b7972031eafff4365
文本 SHA-256:b4109859423f81e56f8797ee816a072ba99412260a227e178005fbd8bfeda631
抽取:htmlparser-reading-v1
字符 631–1136(末端不含)