MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 6 页

Richmond Community Memorial Garden – Planning Process Update, Site Selection Criteria, and Next Steps

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Proximity to water: The degree to whicha site has adjacency to a body of water (human-made or natural) for aesthetic and ritualistic purposes. Note: this criterion has been broken out separately based on clear community preferences and cultural practices that were outlined through the 2025 community engagement process. e Accessibility: The degree to which the site is accessible by multiple modes of transportation, ideally with a public transit stop within 800 metres (an approximately 10-minute walk) of the site. e Aesthetic quality: The degree to which the site contains existing natural features that are conducive to a visually pleasing, contemplative Memorial Garden setting. e Existing servicing: The degree to which existing utilities that may be utilized and/or repurposed to service a future Memorial Garden—such as water, electricity, and sewer— are present on site. e Existing features: The degree to which the site contains existing natural or built features that may be conducive to a future Memorial Garden, e.g., existing trees, buildings that may be repurposed. e Public open space: The degree to whicha site is already associated with and includes publicly accessible open space.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:d3e460910420b4756d484fd4b0ea72538a045640c6f2fa5c37fceb3186b2d145

文本 SHA-256:4d128a69c60f0c37b276d1b3010c6d5278b435f1972323c1cb1595d2b9048b74

抽取:pymupdf-1.26.7-native-footer-ocr150-eng-7d4322bd2a774972-v1
第 6–6 页;字符 11782–12982(末端不含)