Surrey 7923-0072-00 September 11 2023 streamside planning report
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Staff Report to Council
Application No.: 7923-0072-00
Planning & Development Report
Page 4
•
Application No. 7923-0072-00 for a Temporary Use Permit (TUP) to allow the storage of steel
(including pipes, rebar and beams), the parking of approximately 12 oversized trucks and
trailers that exceed 5,000 kilograms (11,000 lbs.) G.V.W. mid-sized forklifts and the use of the
existing house as an office and washroom facility for a period of three years, was presented to
Council for introduction on May 1, 2023 and, after Public Notification, was supported by
Council on May 15, 2023.
•
One of the conditions of the TUP approval is a Sensitive Ecosystem Development Permit
(SEDP) application to be submitted and the SEDP issued for the watercourse/ditch between
the northern property line and Highway No. 1 (see Appendix I). Usually, a standalone SEDP
would be issued by staff but as the SEDP is associated with an in-stream application, the SEDP
requires Council Approval prior to issuance.
DEVELOPMENT PROPOSAL
Referrals
Engineering:
The Engineering Department has no objection to the SEDP.
Parks, Recreation &
Culture:
No concerns.
DEVELOPMENT PERMITS
Sensitive Ecosystems (Streamside Areas) Development Permit Requirement
•
The subject property falls within the Sensitive Ecosystems Development Permit Area (DPA)
for Streamside Areas in the OCP, given the location of an existing Class B (yellow-coded)
watercourse which flows along the north property line. The Sensitive Ecosystems (Streamside
Areas) Development Permit is required to protect aquatic and terrestrial ecosystems
associated with streams from the impacts of development.
•
In accordance with Part 7A Streamside Protection setbacks of the Zoning By-law, a Class B
(yellow-coded) watercourse requires a minimum streamside setback of 15 metres, as measured
from the top of bank. The proposed setbacks (Appendix I) comply with the requirements
outlined in the Zoning By-law. The previous Planning Report to Council on May 1, 2023 for
the Temporary Use Permit erroneously identified this watercourse as a Class B Ditch that
required a 7-metre setback.
•
The riparian area will be protected through the registration of a combined Restrictive
Covenant/Right-of-Way against the property to ensure safeguarding and maintenance of the
Protection Area in perpetuity, in compliance with the OCP.
•
A landscape plan to improve and safeguard the riparian ecosystem adjacent to the developable
portion of the site with a vegetated buffer was submitted. The approximately 54 additional
trees proposed to augment the buffer include 5 native tree species consisting of maple, firs,
cedars, pines and gingko trees. The applicant is also proposing to retain 4 existing mature
trees in the buffer area.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:ac8b2ff7d9c47e19e2d74e03f0444cea382a98d93411293a28c5da4e92ba4563
文本 SHA-256:5dc4d581e9b348d28f6b1145e48c6de691454b6199b2ec8f367c676da6ce77b7
抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 3543–6382(末端不含)