DRAFT CHILD CARE STRATEGY 2024–2034
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
June 6, 2024
- 7 -
7675622
The actions have been developed in response to the opportunities, challenges and needs
identified during the analysis of the demographic and child care data, best practices and
extensive engagement activities. For each action, the City’s role has been identified, as either
acting, facilitating or advocating. Some of the actions require collaboration with community
partners, including other levels of government, community organizations, public bodies and child
care operators. For each action, a timeline has been identified across the 10-year plan period.
Specific targeted activities will be identified in annual work plans to support the advancement of
actions outlined in the strategy.
The five strategic directions are:
1. Create and maintain child care spaces
2. Quality, inclusivity and accessibility
3. Advocacy
4. Collaboration
5. Education and information
Public Engagement Process
Public engagement on the draft Child Care Strategy will provide valuable input to ensure it
captures the community’s needs and priorities for the next ten years. Feedback received through
this process will be taken into account as the Child Care Strategy is finalized. A summary of
input will be presented to City Council alongside the final Child Care Strategy for Council’s
consideration.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:5d07b5eb7cb95ade072ee2523572768b94e9500d0fd14cbb6a8acce2c53d62ad
文本 SHA-256:90d8d42c78d2d58b775ddeef23e2db7775cf39851808efa05440ba2c403b13a6
抽取:pymupdf-1.26.7-text-pages-v1
第 7–7 页;字符 14470–15799(末端不含)