Proposed Interim Energy Centre Location at 3760, 3780 Sexsmith Road, and 8651 Cambie Road
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Locating IEC#8 at this location would also offer a number of benefits for LIEC and its
customers:
•
An energy centre located at this site would reduce upfront infrastructure capital cost
because shorter piping would be needed to distribute energy.
•
This site offers enough space to locate an energy centre that services not only the
affordable housing development, but also upcoming developments in the Capstan and
Aberdeen areas for both heating and cooling services.
•
Servicing developments in the Capstan and Aberdeen areas allows for planned
infrastructure such as Capstan IEC#5 and Aberdeen IEC#6 to be delayed until
development activity in these areas accelerates, further reducing upfront infrastructure
capital investment.
•
Site is clear of the existing buildings and trees, reducing the infrastructure cost.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:9904727b8c2fbe9548b4715b8200a655e51ffaf1c08176890aacf1d000cd16a1
文本 SHA-256:23f1c9140b1bfa8d48496f8fa93c26710cc151b36eb8c685a56dc42411221f01
抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 4933–5767(末端不含)