Surrey 7922-0244-00 May 2023 planning report
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
A Riparian Area Protection Regulation (RAPR) report and an Ecosystem Development Plan,
prepared Ryan Preston, P. Ag.., of Bluelines Environmental Ltd. calculated the streamside
protection and enhancement area (SPEA) as 2.0 metres from high-water-mark, which is equal
to the top-of-bank in this case. The proposal has been reviewed by the Province and found to
meet the provisions of the RAPR. As such, the proposed setback variance will meet Provincial
streamside protection requirements.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:3a77a47638ff6b7bed3d929abf4e1981fef8de0f60a8e3f85d27cf4024d8e90e
文本 SHA-256:b21f4955c87dabf57fdcbae9157ed02d336298e43d8262633e6755b203036ad8
抽取:pymupdf-1.26.7-text-pages-v1
第 6–6 页;字符 10181–10674(末端不含)