MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 3 页

Securing Road Dedication at Building Permit - Implementation Strategy

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff reviewed the roadways fronting SSMUHs in relation to the City’s transportation objectives as set out in the OCP (Attachment 1), Bylaw No. 8751, and the City’s Engineering Design Specifications. The review concluded that road dedication should be prioritized for building permit applications on select arterial roads where future improvements such as cycling facilities, treed boulevards, wider sidewalks, multi-use pathways, rear lanes, and left-turn bays are envisioned.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:a78db9101dbad6c04cddb9591c981b328f40095c1eb8d84c05edc3de2b0add75

文本 SHA-256:6d1967c8ce3129750d8b5154c96c3e434b8fc5ffbd059cf809fa1398a9165755

抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 6311–6793(末端不含)