UBCM Community Emergency Preparedness Fund: 2024/25 Disaster Risk Reduction – Climate Adaptation Grant Applications
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
The Blundell Road Canal Improvements project (Category 3), includes upgrades to the canal along
the north and south side of Blundell Road between Sidaway Road and No. 6 Road. The upgrades
will increase flood conveyance capacity by removing blockages along the canal and increasing the
storage volume of the canal. The canal is also classified as a channelized watercourse within the
City's Riparian Management Area network. Prior to commencing, staff will obtain a qualified
environmental professional to support project planning and to oversee construction, monitoring, and
restoration activities. As part of the City's ongoing asset management program, a number of canals
have been identified for upgrades based on the condition of the canal, potential road safety issues
due to sloughing canal banks, and flood conveyance concerns. The Blundell Road location is high
priority based on field observations.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:16b72c0bebe3e5694d15a37e6e390d62a86e4aacd348df6436d7bb8b86b71a06
文本 SHA-256:b664b1ed8808b1342958acef84a54c6aa2e3d5c74afdbcbb0702bac6f45e9983
抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 7527–8443(末端不含)