Staff Report to Council
Application No.: 7922-0223-00
Planning & Development Report
Page 8
Transportation Considerations
Road Network and Infrastructure
•
As part of the subject development, the applicant will be required to provide the following
improvements:
o Dedication and construction of 104A Avenue; and
o Dedication and construction of new 145 Street.
•
The alignment of 145 Street, as identified in the Stage 1 Plan, is proposed to be shifted slightly
east, in consideration of the consolidation pattern of the block and to better distribute road
requirements for the blocks to the north. As part of the Stage 2 Plan process, staff will be
reviewing the ultimate alignment for future 145 Street, particularly adjacent to the “School”
site identified on the north side of 104A Avenue, in consultation with the School District to
ensure the needs for the planned school site are met.
Traffic Impacts
•
As part of the Stage 2 Plan process, a transportation impact analysis (TIA) was conducted to
evaluate the overall traffic impacts of redevelopment throughout the Plan area. This process,
as opposed to a piecemeal evaluation approach, is preferred to better inform the required
infrastructure improvements to support the projected overall growth within the Plan.
•
According to industry standard rates, the proposal is anticipated to generate approximately
one vehicle trip per minute in the peak hour. A site-specific transportation impact analysis
was not required as the proposal is below the City’s minimum threshold and complies with
the Stage 1 Plan designation, with the anticipated land-use and density on the subject site
having been taken into account as part of the Stage 2 transportation impact analysis for the
overall Plan area.
Dedication Requirements, Driveway Access and Parking
•
As part of the subject application, the applicant will be required to dedicate:
o 2.942 metres for 104A Avenue;
o Varying widths of dedication for future 145 Street; and
o A 3.0 metre by 3.0 metre corner-cut at the intersection of 104A Avenue and 145 Street.
•
The proposed development will obtain vehicular access to the underground parkade from 145
Street. No direct vehicle access is permitted to/from 104A Avenue.
•
The applicant will be constructing 104A Avenue and 145 Street to accommodate on-street
parking along the site frontages.
Modified Alignment for Future 145 Street
•
In the Stage 1 Plan, a future “School” site is identified on the north side of 104A Avenue, just
east of future 145 Street. As part of the Stage 2 Plan, staff will be reviewing the ultimate road
alignment for future 145 Street taking into consideration the needs of the School District.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:063e4b09294cc9baa26fb083a4ea236153058f32f5d3844a9373acfcc584b33b
文本 SHA-256:4b218772fce428edf00c1fa3256946bbfe205389d2a57b830f5e6732a6c4de37
抽取:pymupdf-1.26.7-text-pages-v1
第 8–8 页;字符 12672–15432(末端不含)