MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 8 页

Surrey official source 7922-0223

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0223-00 Planning & Development Report Page 8 Transportation Considerations Road Network and Infrastructure • As part of the subject development, the applicant will be required to provide the following improvements: o Dedication and construction of 104A Avenue; and o Dedication and construction of new 145 Street. • The alignment of 145 Street, as identified in the Stage 1 Plan, is proposed to be shifted slightly east, in consideration of the consolidation pattern of the block and to better distribute road requirements for the blocks to the north. As part of the Stage 2 Plan process, staff will be reviewing the ultimate alignment for future 145 Street, particularly adjacent to the “School” site identified on the north side of 104A Avenue, in consultation with the School District to ensure the needs for the planned school site are met. Traffic Impacts • As part of the Stage 2 Plan process, a transportation impact analysis (TIA) was conducted to evaluate the overall traffic impacts of redevelopment throughout the Plan area. This process, as opposed to a piecemeal evaluation approach, is preferred to better inform the required infrastructure improvements to support the projected overall growth within the Plan. • According to industry standard rates, the proposal is anticipated to generate approximately one vehicle trip per minute in the peak hour. A site-specific transportation impact analysis was not required as the proposal is below the City’s minimum threshold and complies with the Stage 1 Plan designation, with the anticipated land-use and density on the subject site having been taken into account as part of the Stage 2 transportation impact analysis for the overall Plan area. Dedication Requirements, Driveway Access and Parking • As part of the subject application, the applicant will be required to dedicate: o 2.942 metres for 104A Avenue; o Varying widths of dedication for future 145 Street; and o A 3.0 metre by 3.0 metre corner-cut at the intersection of 104A Avenue and 145 Street. • The proposed development will obtain vehicular access to the underground parkade from 145 Street. No direct vehicle access is permitted to/from 104A Avenue. • The applicant will be constructing 104A Avenue and 145 Street to accommodate on-street parking along the site frontages. Modified Alignment for Future 145 Street • In the Stage 1 Plan, a future “School” site is identified on the north side of 104A Avenue, just east of future 145 Street. As part of the Stage 2 Plan, staff will be reviewing the ultimate road alignment for future 145 Street taking into consideration the needs of the School District.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:063e4b09294cc9baa26fb083a4ea236153058f32f5d3844a9373acfcc584b33b

文本 SHA-256:4b218772fce428edf00c1fa3256946bbfe205389d2a57b830f5e6732a6c4de37

抽取:pymupdf-1.26.7-text-pages-v1
第 8–8 页;字符 12672–15432(末端不含)