Public Electric Vehicle Charging Network – Direct Current Fast Charging Expansion
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Phase 1 of this expansion is proposed to include three sites, each featuring 8-10 DCFC charging
ports for a total of24-30 chargers. Each charger will have power output of 150-200 kW; capable
of charging an EV up to 80% in less than 40 minutes. The Richmond Curling Club, Minoru Park
precinct and South Ann Community Centre have been identified as the three proposed sites for
Phase 1. Suitability of these sites is based upon surrounding housing types, population density
and proximity to EV charging, ensuring optimal accessibility and utilization.