City of Vancouver’s Official Development Plan – Opportunity to Provide Feedback
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Transportation: Vancouver's draft ODP identifies major transit con-idors and
conceptual interregional connections, including potential public transit enhancements
along Knight Street and future high-capacity transit links. The goal is to help people
meet their daily needs without having to drive. Key elements include:
82752 13
o Major Transit Network: Proposed enhancements between Southeast Vancouver
and Richmond via the Knight Street Bridge, which may accelerate improved
capacity and connectivity between the two cities.
o Express/Interregional Transit: Conceptual plans for future high-capacity transit
connections in Richmond, to be dete1mined through future studies.
o
Canada Line Capacity: Vancouver's ODP identifies capacity relief measures for
the Canada Line due to Vancouver's population growth projections. TransLink
also identified measures such as additional trains, platf01m expansions, and
service frequency increases. The proposed R7 Rapid.Bus route connecting
Richmond-Brighouse to Metrotown via Knight Street Bridge is also noted by
Vancouver staff as a capacity relief measure beyond the Canada Line.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:955d9ad85af1a2deb64665ed24f5423abb1cca3ec76f33f0ca69db3a11a006f2
文本 SHA-256:3f5b502a09e0ed9b7981bddd219038d677024cac1489d28156736f6eefd44737
抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 6542–7681(末端不含)