The applicant wishes to remove 28 on-site trees (tag# 450,453,454,455,456,457,458,459,
460,461,462,463,464,465,466,470,471,472,473,474,475,476,477,478,479,480,481,
482). As per the Tree Protection Bylaw No. 8057, the 2: 1 and 3: 1 replacement ratios would
require a total of 58 replacement trees at the following minimum sizes:
58
The applicant's preliminary Landscape Plan (Attachment 5) proposes to plant 37 replacement
trees on the subject site. To satisfy the replacement ratios established in the OCP, the applicant
will contribute $15,750.00 to the City's Tree Compensation Fund in lieu of the remaining 21
trees that cannot be accommodated on the subject property after redevelopment. At DP stage,
staff will continue exploring further landscaping and tree planting opportunities with the
applicant.
Tree Protection
Two trees (tag# 451 & 452) on neighbouring properties are to be retained and protected. The
applicant is committed to retaining and protecting two trees (tag# 467 & 468) on-site. A tree
protection plan showing the trees to be retained and the measures taken to protect them during
development stage has been submitted (Attachment 6). To ensure that the trees identified for
retention are protected at development stage, the applicant is required to complete the following
items:
•
Prior to final adoption of the rezoning bylaw, submission to the City of a Tree Survival
Security in the amount of $20,000.00 to ensure that the two on-site trees identified for
retention will be protected.
•
Prior to final adoption of the rezoning bylaw, submission to the City of a contract with a
Certified Arborist for the supervision of all works conducted within or in close proximity to
tree protection zones. The contract must include the scope of work required, the number of
proposed monitoring inspections at specified stages of construction, any special measures
required to ensure tree protection, and a provision for the arborist to submit a post-
construction impact assessment to the City for review.
•
Prior to demolition of the existing dwelling on the subject site, installation of tree protection
fencing around all trees to be retained. Tree protection fencing must be installed to City
standards in accordance with the City's Tree Protection Information Bulletin Tree-03 prior to
any works being conducted on-site and remain in place until construction and landscaping
on-site is completed.
Affordable Housing Strategy and Market Rental Housing Policy
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:ec58bdc7473e79fe7347780edd5f0c4c84b08dc216b9fa0fe64445d1e952071c
文本 SHA-256:992e75479dc4321e17ad53175a8f97688fbb1c010c9a9f4075be0af59f6ab60a
抽取:pymupdf-1.26.7-text-pages-v1
第 7–7 页;字符 16015–18526(末端不含)