Surrey 2026-06-15 市议会土地使用会议
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
It was
Moved by Councillor Hepner
Seconded by Councillor Bains
That:
1.
Council support amending the South Westminster Neighbourhood
Concept Plan for changes to the road network and consider passing a
resolution when the project is considered for Development Permit
issuance.
2.
Council authorize staff to draft Development Permit No. 7925-0387-00
generally in accordance with the attached drawings (Appendix A).
3.
Council instruct staff to resolve the following issues prior to final approval:
(a)
resolution of all engineering requirements to the satisfaction of the
General Manager, Engineering (Appendix B);
(b)
submission and acceptance of finalized architectural drawings,
including resolution of all urban design issues, to the satisfaction of
the Planning and Development Department;
(c)
submission and acceptance of finalized landscaping drawings,
including resolution of all landscape design issues, and a
landscaping cost estimate to the satisfaction of the Planning and
Development Department;
(d)
submission and acceptance of a finalized arborist report, including
satisfying the required tree replacement, to the satisfaction of the
Planning and Development Department;
(e)
submission and acceptance of a finalized Ecosystem Development
Plan to the satisfaction of the Planning and Development
Department;
(f)
submission and acceptance of a finalized Geotechnical Report to
the satisfaction of City staff;
(g)
approval from the Ministry of Environment;
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:c4460910c326159dd8f1d4ebaf34ae37e4817f12717420895e3de5a83868f5bd
文本 SHA-256:1b51acd4e8db0ceded94148e873e6f39509b5cc37d9a454636b14de1a474283e
抽取:pymupdf-1.26.7-text-pages-v1
第 3–3 页;字符 3887–5417(末端不含)