Staff Report to Council
Application No.: 7923-0250-00
Planning & Development Report
Page 5
Application No. 7922-0191-00 and CD Bylaw No. 20851 was granted Third Reading
(Conditional Approval) at the March 6, 2023 Regular Council – Public Hearing meeting.
As a condition of approval for the rezoning and subdivision for Development Application No.
7922-0191-00 (subject site application), all existing uses must cease and existing buildings
must be removed.
The existing farm building along 28 Avenue at 2825 – 192 Street is part of an existing chicken
farm. Due to requirements set by the BC Chicken Marketing Board, the sale of chickens as
part of the existing farm operation will take several months to complete. In order to allow the
business park development to proceed without delay, a temporary use permit is being
contemplated to allow the farm operation to continue following Final Adoption of CD Bylaw
No. 20851, until such a time that all chickens have been sold and the building can be
demolished. This will allow initial site servicing and construction associated with
Development Application No. 7922-0191-00 to commence.
DEVELOPMENT PROPOSAL
Planning Considerations
The applicant proposes a temporary use permit to permit the continued farm operation on a
portion of the subject site (2825 – 192 Street) for a period not to exceed 90 days.
The property is currently zoned “General Agriculture Zone (A-1),” which permits the current
farm operation and building. The proposed TUP will allow for the use to continue in the
interim upon Council granting Final Adoption to CD Bylaw No. 20851. Once the rezoning
occurs, the use will no longer be permitted, other than those uses granted under the proposed
TUP, should it be supported by Council.
Upon completing the sale of all chickens on the property the owner will undertake the
required building demolition and the TUP will cease. A 90 day TUP term is proposed to allow
for the sale of all chickens and complete the demolition process.
Proposed
Lot Area
Gross Site Area:
11.4 hectares
Road Dedication:
1.0 hectare
Undevelopable Area:
n/a
Net Site Area:
10.4 hectares
Number of Lots:
1
Building Height:
8.8 m
Referrals
Engineering:
The Engineering Department has no objection to the project
subject to the completion of Engineering servicing requirements as
outlined in Appendix III.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:3200e7fbaee1422b34c03a0a1db1c7659223e87071d95de36a4eeaad9a061dd3
文本 SHA-256:ca4ccd99c313beffba89c40e73252799ee4c4fd64687e98043b4e24fb6d659c9
抽取:pymupdf-1.26.7-text-pages-v1
第 5–5 页;字符 5778–8154(末端不含)