MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 12 页

Surrey 2026-01-26 市议会土地使用会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

3. Council authorize staff to draft Development Permit No. 7923-0219-00 generally in accordance with the attached drawings (Appendix C), and the finalized Ecosystem Development Plan. 4. Council endorse Development Variance Permit No. 7923-0219-00, varying the following in the Zoning Bylaw to proceed to Public Notification and bring the Development Variance Permit forward for an indication of support by Council: (a) in Section F Yards and Setbacks of Part 22 Multiple Residential 30 Zone (RM-30), reduce the minimum side yard setback from 6.0 metres to 5.0 metres to the principal building face of Buildings 8 and 9, to 3.8 metres for Building 7 and to 3.0 metres for Building 11; (b) in Section F Yards and Setbacks of Part 22 Multiple Residential 30 Zone (RM-30), reduce the minimum rear yard setback from 6.0 metres to 4.0 metres to the principal building face of Building 16; (c) in Section B.26(b) of Part 4 General Provisions, permit more than three stair risers within the front, rear and side street setback areas; and (d) in Section B.1 Streamside Setback Areas of Part 7A Streamside Protection, reduce the minimum setback distance for a Class B stream from 15 metres to 10 metres from the top of bank. If supported, the Development Variance Permit will be brought forward for issuance and execution by the Mayor and City Clerk in conjunction with the final adoption of the associated rezoning bylaw once all outstanding conditions are satisfied. 5. Council instruct staff to resolve the following issues prior to final approval: (a) resolution of all engineering requirements to the satisfaction of the General Manager, Engineering (Appendix E); (b) submission of a subdivision layout and road dedication plan to the satisfaction of the Approving Officer; (c) submission and acceptance of finalized architectural drawings, including resolution of all urban design issues, to the satisfaction of the Planning and Development Department; (d) submission and acceptance of finalized landscaping drawings, including resolution of all landscape design issues, and a landscaping cost estimate to the satisfaction of the Planning and Development Department;

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:358b49866f9b05b1fd02fee91c8a9b6c3e282d44ff81cf47dfb184e55f260d6b

文本 SHA-256:4cd71fbaa645006ddbd4819907123f6a7fa542bb100a26d1c7f6e2b8d7ac7ab5

抽取:pymupdf-1.26.7-text-pages-v1
第 12–12 页;字符 21946–24178(末端不含)