MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 17 页

Surrey 2025-07-28 市议会土地使用会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

(c) to increase the building height of the IB-3 Zone from 14 metres to 18.2 metres for Building 1 and 16.7 metres for Building 2; and (d) to reduce the minimum width of a continuous landscaping strip along the developed portion of the lot abutting a highway required in the IB-3 Zone, from 3.0 metres to 1.5 metres along the south property line. 3. Council instruct staff to resolve the following issues prior to final adoption: (a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering; (b) resolution of all urban design issues to the satisfaction of the Planning and Development Department; (c) submission of a finalized landscaping plan and landscaping cost estimate to the specifications and satisfaction of the Planning and Development Department; (d) the applicant satisfy the deficiency in tree replacement on the site, to the satisfaction of the Planning and Development Department; (e) registration of a Section 219 Restrictive Covenant for installation and maintenance of the updated landscape buffer; and (f) registration of a cross-access easement for a shared access and shared parking arrangement between 6875 - 152 Street and 6862 - 153 Street. RES.R25-1931 Carried

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:40e180feef3711e36238499bae4fba704178eb8df82689fe4e36ddad4a20dc14

文本 SHA-256:26b32f9cf681f29793fdfa89feb6aad75f7bd386b5ee95074becd74e811f3b99

抽取:pymupdf-1.26.7-text-pages-v1
第 17–17 页;字符 32841–34218(末端不含)