be appropriate to meet the requirement of Section 475 of the
Local Government Act.
3.
a Bylaw be introduced to rezone the subject site from Acreage Residential
Zone (RA) to Multiple Residential 30 Zone (RM-30), and a date be set for
Public Hearing.
4.
Council authorize staff to draft Development Permit No. 7925-0283-00
generally in accordance with the attached drawings (Appendix A).
5.
Council endorse Development Variance Permit No. 7925-0283-00, varying
the following in the Zoning Bylaw, to proceed to Public Notification and
bring the Development Variance Permit forward for an indication of
support by Council:
(a)
in Section F. "Yards and Setbacks" of Part 22 Multiple Residential
30 Zone (RM-30), reduce the minimum side yard (north and south)
setbacks from 6 metres to 3 metres for buildings #1 through #10.
If supported, the Development Variance Permit will be brought forward for
issuance and execution by the Mayor and City Clerk in conjunction with
the final adoption of the associated OCP and rezoning bylaws, and
associated Development Permit.
6.
Council instruct staff to resolve the following issues prior to final approval:
(a)
resolution of all engineering requirements to the satisfaction of the
General Manager, Engineering (Appendix C);
(b)
input from the Ministry of Transportation & Transit under
File No. 2026-00859;
(c)
submission and acceptance of finalized architectural drawings,
including resolution of all urban design issues, to the satisfaction of
the Planning and Development Department;
(d)
submission and acceptance of finalized landscaping drawings,
including resolution of all landscape design issues, and a
landscaping cost estimate to the satisfaction of the
Planning and Development Department;
(e)
submission and acceptance of a finalized arborist report, including
satisfying the required tree replacement, to the satisfaction of the
Planning and Development Department;
(f)
the applicant provide a density bonus amenity contribution
consistent with the Tier 2 Capital Projects CACs in support of
the requested increased density, to the satisfaction of the
General Manager, Planning and Development Department;
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:925a672c308cf4772e417aa85860919ec6e972aa03cf34046b68b9c8c5966619
文本 SHA-256:572687f994d2f810f2803d0563e9775ea1d19606512c40c4aff89d2a942b0169
抽取:pymupdf-1.26.7-text-pages-v1
第 8–8 页;字符 13116–15344(末端不含)