MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 5 页

steveston cannery channel dredging project update and expanded scope of work

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Proposed Expanded Scope of Work – Imperial Landing and Britannia Heritage Shipyards Waterlots The original scope of work for dredging at these sites was focused on the area outside of the docks and adjacent to the channel dredging. (see Attachment 1) Since that time, staff have been made aware of operational impacts with sediment build up on the inside of the docks. At low tide, both the ramps and boats at Britannia, including the Silver Ann, are sitting on mud, and therefore are at risk of damage and are rendered inaccessible. Similarly, dredging at Imperial Landing will provide for increased movement and moorage of boats, resulting in increased revenues and enhanced access.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:178d8cb242e095561729ef976611bbec555883f4ab76032fb5899fd3c3fd8d5c

文本 SHA-256:3394cfa65666de923c97c9644f6bc4fa92274d3f1500cd30341b9a1d1310f606

抽取:pymupdf-1.26.7-text-pages-v1
第 5–5 页;字符 9358–10054(末端不含)