MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 21 页

Surrey planning report 7922-0150-00

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

Staff Report to Council Application No.: 7922-0150-00 Planning & Development Report Page 9 IB-2 Zone (Part 47B) Permitted and/or Required Proposed Unit Density: n/a n/a Floor Area Ratio: 1.0 0.47 Lot Coverage: 60% 45% Yards and Setbacks North: 7.5 metres 35 metres East: 7.5 metres (no parking) / 9 metres (parking) 35 metres / 9 metres South: 16 metres (parking) 32 metres West: 7.5 metres 22.3 metres Height of Buildings Principal buildings: 14 metres 14 metres Accessory buildings: 6 metres n/a Streamside (Part 7A) Required Proposed Streamside Setbacks Class A (red-coded) Stream: 25 metres 10 metres (DVP) Class B (yellow-coded) Ditch: 7 metres 2 metres (DVP) Parking (Part 5) Required Proposed Number of Stalls Commercial: 107 107 Industrial: 613 615 Total: 720 722 Streamside Variance  The applicant is requesting the following streamside variances: (a) to reduce the minimum setback distance for a Class A (red-coded) channelized stream from 25 metres to 10 metres; and (b) to reduce the minimum setback distance for a Class B (yellow-coded) ditch from 7 metres to 2 metres  The proposed setback reduction for the Class A stream is for the stream along the north side of 16 Avenue, and the Class B ditch is the ditch along the unopened 188 Street road allowance, along the western portion of the site.  The proposed reduced setbacks include a substantial planting plan, and the relocation of the 16 Avenue watercourse into the site, to allow for road widening. Both proposed setbacks comply with the RAPR setbacks.  Additional detailed design is needed to accommodate access and maintenance along the unopened 188 Street watercourse to ensure that this will not encroach into the SPEA, and will transition safely given the site grading. The applicant has committed to further working with staff to confirm any additional right-of-way, and to refining the location, design and height of the proposed retaining wall.  Staff support the requested variances to proceed for consideration.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:debae3ab607914211c57354eb155fd027baf5d70702b930acec6c3df5d61eef3

文本 SHA-256:961423135084e91dc4649a6e55e2a9dde89b67183e40ec2a9e7a32ffbee30b4b

抽取:pymupdf-1.26.7-text-pages-v1
第 21–21 页;字符 32196–34208(末端不含)