Works Yard Replacement Project – Phase 1 Form and Character Design
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Council has approved a total of $174 million for the Project Enabling Works and Phase 1, and
the proposed form and character design has been developed to be delivered within this approved
budget.
Ongoing construction manager pre-construction services include cost estimates, constructability
review, cost-effectiveness, logistics, and overall project schedule determination. For an added
degree of cost certainty, the construction manager reviewed the form and character design and
confirmed alignment with the project budget.
Next Steps
Approval of this key stage will allow staff to continue with detailed design and advance the
Project toward construction.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:ff372d60f11da8611fd69e26ec903f0bc13bde064660a2a6d92c0ddf8a269acf
文本 SHA-256:44448cc114a09dcf98341d66b8751f5e955e618aa3b801222f084d7de2fb98dd
抽取:pymupdf-1.26.7-text-pages-v1
第 8–8 页;字符 16567–17236(末端不含)