North Dike Upgrades from Lynas Lane to No. 2 Road – Public Engagement Summary
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
In developing the Dike Master Plan Concept, the following features were determined:
e
The dike would be raised to the required elevation of 4.7 metres;
e
The roadway would be raised to 4.7 metres elevation;
e
The roadway would be shifted approximately 4.0 metres south ofits current alignment;
e
The gravel multi-use pathway on top of the dike would be reinstated and widened from
approximately 3.0 metres to 4.0 metres;
e
The pedestrian pathway south of the roadway would be reinstated in a similar alignment;
and
e
The paved bike lane would be located on the north side of the roadway at the same height
as the dike.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:e39936e0e2f98d66fe6da6153f1970762060f65b2261879b78ecc53867e9a6ad
文本 SHA-256:86ad83069af410b9b1c08f0de9b1bfe5248dd2097d220dc910b02d6262a3fea5
抽取:pymupdf-1.26.7-native-footer-ocr150-eng-7d4322bd2a774972-v1
第 5–5 页;字符 3376–3994(末端不含)