Staff Report to Council
Application No.: 7922-0177-00
Planning & Development Report
Page 6
RF-10 Zone (Part 17C) Type I
Permitted and/or
Required
Proposed
Unit Density:
37.04 uph (14.99 upa)
19.59 uph (7.93 upa)
Yards and Setbacks
Front Yard (north):
4.0 metres
4.0 metres
Side Yard (east/west):
1.2 metres
1.2 metres
Rear (south):
7.5 metres
7.5 metres
Lot Size
Lot Size:
291 square metres
443.5 square metres
Lot Width:
9.7 metres
11.2 metres
Lot Depth:
30 metres
39.7 metres
Parking (Part 5)
Required
Proposed
Number of Spaces
3
3
Lot Grading and Building Scheme
The applicant retained Tejeshwar Singh of Simplex Consultants Ltd. as the Design Consultant.
The Design Consultant conducted a character study of the surrounding homes and based on
the findings of the study, proposed a set of building design guidelines.
“Neo-Traditional” style homes are recommended to align with the existing neighbourhood
context.
A preliminary lot grading plan, submitted by Terra Nobis Consulting Inc., and dated August
9th, 2022, has been reviewed by staff and found to be generally acceptable. The applicant is
proposing in-ground basements. The feasibility of in-ground basements will be confirmed
once the City’s Engineering Department has reviewed and accepted the applicant’s final
engineering drawings.
Capital Projects Community Amenity Contributions (CACs)
On December 16, 2019, Council approved the City’s Community Amenity Contribution and
Density Bonus Program Update (Corporate Report No. R224; 2019). The intent of that report
was to introduce a new City-wide Community Amenity Contribution (CAC) and updated
Density Bonus Policy to offset the impacts of growth from development and to provide
additional funding for community capital projects identified in the City’s Annual Five-Year
Capital Financial Plan.
The proposed development will be subject to the Tier 1 Capital Plan Project CACs. The
contribution will be payable at the rate applicable at the time of Final Subdivision Approval.
The current rate is $2,000 per new unit.
The proposed development will not be subject to the Tier 2 Capital Plan Project CACs as the
proposal complies with the densities in the Secondary Plan designation.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:aa2dd5b7da8f3af02e887635b5cc8689c3407fe9542801845f6afcb129b08ba9
文本 SHA-256:2337bd9ad4afc648dbf678edbd54e6ac6ad9fe491667025b830fefdc1f416791
抽取:pymupdf-1.26.7-text-pages-v1
第 6–6 页;字符 7115–9396(末端不含)