MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 13 页

Surrey 2024-03-11 市议会公开听证会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

It was Moved by Councillor Bains Seconded by Councillor Kooner That Council: 1. Receive Corporate Report R052 for information; 2. Direct staff to proceed with procurement for the detail design of the 72 Avenue extension between 152 Street to Highway 15 based on Scenario 3, as outlined in the report and as attached in Appendix "I"; and 3. If and only if Council approves Recommendation 2 of this report, then: a. Direct staff to change the designation of the ‘Bear Creek Connector’ from a major road to a greenway corridor for pedestrian and cyclists, as outlined in the report; b. Direct staff to designate 72 Avenue between 152 Street to Highway 15 as a truck route; c. Direct staff to initiate discussions with TransLink to designate 72 Avenue between 152 Street to Highway 15 into the TransLink Major Road Network; and d. Authorize staff to initiate applications, including non-farm use applications if necessary, to the Agricultural Land Commission for the 72 Avenue corridor extension between 152 Street and Highway 15. RES.R24-475 Carried

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:f237b12d470930ec36bc9065037db0ffd95e3a0a581d59a7cbc5c355ee023ece

文本 SHA-256:7a97e634fee530e65178bc5950f8d048376f663cadf27113973e485632a60fe9

抽取:pymupdf-1.26.7-text-pages-v1
第 13–13 页;字符 24041–25132(末端不含)