MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
RICHMOND · 固定版本 · PDF 第 4 页

POTENTIAL ENHANCEMENTS TO THE RAILWAY GREENWAY

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

The final report from PBX reached the following conclusions with respect to existing conditions: • • • • Existing lighting levels for almost the entirety of the Railway Greenway do not meet IES standards; the exception being areas with close proximity(< 30 metres) to lit intersections; Spillage from existing roadway lighting is insufficient to light the Railway Greenway to IES standards; Segment 1 - from Garry Street to Steveston Highway (approximately 470 metres in length) - had the best lighting levels, due to nearby BC Hydro lease lights; and Segment 6- from Granville Avenue to Westminster Highway (approximately 786 metres in length)-had the worst lighting levels, due to the absence of parallel roads to provide light spillage. Potential Lighting Strategy As a reporting deliverable, PBX outlined a lighting strategy that would meet City illumination targets along the Railway Greenway. Based on their lighting assessment and computer simulations, PBX noted that the installation of 166 light poles with a height of 4.57 metres, spaced at 30 metres on centre, with lamp and fixtures that correspond to City Engineering design specifications, would be expected to meet City lighting standards.

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:4bea637a0ac4900e29833f560eadc0c3b273f6b0a13baf4a9ec77fc323b53542

文本 SHA-256:d86591684a00f5c513877688710f78e8f2b68496ad7a73f4fb17dc73deca8ea9

抽取:pymupdf-1.26.7-text-pages-v1
第 4–4 页;字符 8373–9597(末端不含)