APPLICATION BY BENITO KHO AND VERNEY KHO FOR REZONING AT 7520 ASH STREET FROM “SINGLE DETACHED (RS1/F)” ZONE TO “SINGLE DETACHED (RS2/E)” ZONE
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
At Subdivision stage, the applicant must enter into a Servicing Agreement for the design and
construction of engineering infrastructure and frontage improvements, as described in
Attachment 7. Frontage improvements include, but are not limited to, the following:
x Install a new storm service connection, complete with inspection chambers near the
Armstrong Street frontage to service proposed Lot 2.
x Armstrong Street: pavement widening, new 1.5 m wide concrete sidewalk at the new
property line, 1.5 m wide treed/grassed boulevard and 0.15 m wide curb and gutter.
x Ash Street: road widening, new 1.75 m wide concrete sidewalk at the property line, 3.1 m
wide treed/grassed boulevard and 0.15 m wide curb and gutter.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:e5caef8abfbca0abb00423ecb806c6917d1318a1012f0db5003f98f2d91a6d28
文本 SHA-256:30da46df2be966962ad6a2af411f49df2c55a60e3189a5c1d7240e28dd94b5fd
抽取:pymupdf-1.26.7-text-pages-v1
第 6–6 页;字符 12321–13048(末端不含)