North Dike Upgrades from Lynas Lane to No. 2 Road – Public Engagement Summary
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
studies required to support detailed design, and advancement of the approvals process including
any required environmental, heritage and other regulatory permits. Following completion of
detailed design and the permitting process, staff would proceed to construction.
Budgetary Implications
This project is a recipient of the Government of Canada's Disaster Mitigation and Adaptation
Fund (DMAF) grant, which provided the City with funding for multiple drainage pump stations
and perimeter dike improvement projects, including the North Dike Upgrades from Lynas Lane
and No. 2 Road. Funding to complete the design and construction of this project is available
through the 2020 to 2026 Disaster Mitigation and Adaptation Fund Infrastructure Upgrades
Projects. The preliminary construction estimate is $16 million for the North Dike Upgrades from
Lynas Lane to No. 2 Road, based on the Dike Master Plan Concept. Sufficient funding is
available from existing capital accounts, using a combination of grant and utility funding.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:e39936e0e2f98d66fe6da6153f1970762060f65b2261879b78ecc53867e9a6ad
文本 SHA-256:86ad83069af410b9b1c08f0de9b1bfe5248dd2097d220dc910b02d6262a3fea5
抽取:pymupdf-1.26.7-native-footer-ocr150-eng-7d4322bd2a774972-v1
第 13–13 页;字符 27332–28366(末端不含)