August 27, 2025
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
The proposed development will be constructed in three phases and includes a three-storey
school building (first phase), gymnasium/cafeteria (second phase) and auditorium (third
phase), which will be located in the northwestern portion of the site zoned “Assembly
(ASY)”.
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:901389c4991a819b37c9bcfcb49b6a5075a8232d0aeab7e29173735bdacd0309
文本 SHA-256:62494f4d3041a92d9286da4844b7266f9d157f27d1d10858b57e83c5d144ae97
抽取:pymupdf-1.26.7-text-pages-v1
第 2–2 页;字符 2251–2521(末端不含)