MetroVote 简体中文
公开试运行资料持续补充 · 名单日期见各选举页查看范围 ↗
SURREY · 固定版本 · PDF 第 16 页

Surrey 2025-09-29 市议会公开听证会议

这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。

It was Moved by Councillor Annis Seconded by Councillor Bose That Council: 1. Receive Corporate Report R204 for information; 2. Approve the City conditions outlined in Appendix "I" attached to the report as requirements for TransLink to move forward with the 30% design work for the King George Boulevard Bus Rapid Transit ("BRT") project; and 3. Endorse TransLink to proceed with the 30% BRT concept design and analysis, including refinement of design options, traffic operations review, and stakeholder engagement, as outlined in the report provided the City required conditions are met. RES.R25-2360 Carried

非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗

打开官方 PDF ↗
版本与字符定位

留存文件 SHA-256:e972cc33ab1c940c49f8ca89e59da7d98c478f2d1ad27b3d2d6fb8c15c8d87d5

文本 SHA-256:d6f9f2f1dbc4a37bc1e890c12b945685899a18facb6827c7d17cb3a86b495516

抽取:pymupdf-1.26.7-text-pages-v1
第 16–16 页;字符 30701–31337(末端不含)