Mezzanine Rating:
Washrooms:
Roof Rating:
Suite Separations:
Fire Alarm System:
Loadbearing Elements:
Occupant Load:
Application:
Classification:
Building Area:
No. Storeys:
No. of Streets:
Sprinklers:
Occupancies:
Floor Rating:
B.C. Building Code 2018
PRELIMINARY BUILDING CODE REVIEW
Construction Type:
City of Surrey Zoning Bylaw 12000
CITY BYLAW SUMMARY
PROJECT DATA
TOPOGRAPHICAL SURVEY
SITE PLAN
SOUTH BLDG.: FLOOR PLANS
NORTH BLDG.: FLOOR PLANS
SOUTH & NORTH BLDGS.: ROOF PLANS
ELEVATIONS- 1
ELEVATIONS- 2
SITE & BUILDING SIGNAGES
SITE & BUILDING SECTIONS
RENDERED VIEWS 1
RENDERED VIEWS 2
DRAWING LIST
Architectural
A 100
A 105
A 200
A 310
A 320
A 330
A 410
A 420
A 430
A 500
A 600
A 610
Permitted / Required
Proposed / Provided
Structural
Mechanical
Electrical
PROJECT CONTACTS
Landscape
Survey
Accessibility:
Fire Protection
Civic Address:
Legal Description:
Current Zoning:
Proposed Zoning:
OCP Land Use:
Lot Size:
13327- 76 Ave., Surrey, B.C.
East Half of Lot 2 Except Part in LMP41586, Section 20, Township 2,
New Westminster District, Plan 15884
IL Light Impact Industrial Zone
IL Light Impact Industrial Zone (No Change)
Industrial
Approx. 8,340 Sq.m. Gross (2.06 Acres); See Survey and Site Plan
Permitted Uses:
Density:
Lot Coverage:
Yards and Setbacks:
Front Yard
Rear Yard
Side Yard
Bldg./ Structure Ht.:
Off-Street Parking:
Off-Street Loading:
Bicycle Spaces:
FAR of 1.0 based on Permitted Increases
60%
Yards and Setbacks:
7.5m
7.5m
7.5m (if one side 7.5m, other side may be nil)
Max. 18m
Proposed Building Shell as shown:
Industrial: 1 per 100 sq.m.
3,762 / 100 = 37.6 Cars
Offices: 1 per 40 sq.m.
1,578 / 40 = 39.4 Cars
Total: 77 Cars Required
1 Req'd for each O/H Door
N/A
To Comply;
to be confirmed at T.I./B.P. applications
5,340/8,340 = FAR 0.64
3,762/8,340 = 45%
Yards and Setbacks:
Min. +/- 7.6m
Min. +/- 7.6m
Min. +/- 17.6m East side; Min. +/- 0.15m West side
South Bldg. 10.44 m
North Bldg. 10.73 m
Spaces Provided = 77
Standard Stalls = 73
H/C Stalls = 2
Small Stalls = 2
* See A200 for detailed Calculation
1 provided for each O/H loading door = 16 Stalls
N/A
Standpipe:
Hydrant Requirements:
Exit Requirements:
Landscape
INTERFACE ARCHITECTURE INC.
#230 - 11590 Cambie Road
Richmond, B.C. V6X 3Z5
Ph: 604.821.1162 Fx: 604.821.1146
[email protected]
Attn. John Lo Architect, AIBC
Architect
Civil
Geotechnical
Geotechnical
DESIGN / CONSTRUCTION RATIONALE
The proposed development site is designated in the OCP for Industrial Use. The site is currently zoned IL- Light Impact
Industrial with an existing old industrial building located on the south half of the site (to be demolished). The proposed Zoning
will be unchanged and proposed Uses will comply with the IL Zoning District.
The site is located just one and a half block west of King George Boulevard on 76 Ave. at the southeast quadrant of an older
establish industrial area close to the center of Newton. It is also close to the King's Cross Shopping Center and large format
retailers such as Costco and Canadian Tire on King George just south of 76 Ave.
The subject site is about 2 acres in size in a long rectilinear configuration oriented north-south. The proposed development is
for two small-bay industrial buildings approximately 20,000 SF each demise-able to up to 8 tenants. The users / tenants are
expected to be small to medium sized enterprises (SMEs) who are the largest employers in most communities. They are likely
to be small industrial, transport and auto-related businesses, building contractors and similar tenants. The intent at this time is
to make a 'building shell' permit application with tenant improvement building permit applications to follow.
The site and building design emphasize the building ends and corners, one of which is visually seen from 76 Ave. The north
building also protrudes east to be more visually prominent from the south access of the site. Each unit has its own parking and
loading space which is important to this user type. The proposed construction method is concrete tilt-up construction. This is
in-keeping with the proposed use as well as the context of the redeveloping industrial area. This development is to conform
with the Surrey Official Community Plan, Zoning Bylaws and all other Development Requirements.
Fire Walls:
Owner
Builder
Survey
Civil
LOWER MAINLAND CONTEXT
AERIAL CONTEXT
SITE AERIAL
PMG LANDSCAPE ARCHITECTS
#100- 4185 Still Creek Drive
Burnaby, B.C. V5C 6G9
Ph: 604.294.0011
[email protected]
Attn. Patricia Campbell- MBCSLA
BROTHER FORTUNE PROPERTY HOLDING LTD. PARTNERSHIP
#2600- 1066 W. Hastings Street,
Vancouver, B.C. V6E 3X1
Ph: 604.889.9811
[email protected]
Attn. Xia Li
WALES MCLELLAND CONSTRUCTION
6211 Fraserwood Place
Richmond, B.C. V6W 1J2
Ph: 604.638.1212
Fx: 604.638-1211
Attn. Gavin Lee
[email protected]
BENNETT LAND SURVEYING LTD.
22371 St. Anne Ave.
Maple Ridge, B.C.
P: 604.463.2509
Not Required
3.2.2.77. Group F-2,
Up to 4 Storeys, Sprinklered
& 3.2.2.63. Group D,
Up to 2 Storeys, Sprinklered
South Bldg. 1,870 Sq.m.
North Bldg. 1,951 Sq.m.
NPPA 13 Required
Combustible or Noncombustible
used singly or in combination
Up to 2 Storeys (3.2.2.63. more stringent)
N/A
- from H/C parking To H/C Building Access w/ Signage
- to Toilet Room or accessible washrooms
- TBD
Requirements
Provided
Fire Separation w/ Min. 45 min. F.R.R. Req'd
(3.2.2.77. more stringent)
To be Determined at T.I. Permit
Required and Single Stage Provided /
Signal to Fire Dept.
45m to Siamese Connection;
45m from Hydrants to Points of Response
Medium Hazard Industrial Group F-2
with Group D (Business Offices) Use
BCBC Parts 3, 4, 5, 6, 7 & 10
To Conform, To be Shown at Individual
Tenant Improvement Building Permit
BCBC Parts 3, 4, 5, 6, 7 & 10
Distribution and Storage Facility
This application for 'building shell-only'
Tenant Improvement building permit(s)
to follow for tenant occupancies
Medium Hazard Industrial Group F-2
with Group D (Business Offices) Use
Distribution and Storage Facility
This application for 'building shell-only'
Tenant Improvement building permit(s)
to follow for tenant occupancies
Design to the more stringent requirements of
3.2.2.75. Group F-2 & 3.2.2.61. Group D
Design to be Noncombustible
N/A
No (None Required)
Permitted: 2,400 Sq.m. if 2-storeys
(3.2.2.63. more stringent)
Both Buildings 2-Storeys
1 Street-Facing
Yes; NPPA 13
System monitored
To be Determined at T.I. Permit
Not Applicable
Not Applicable
Fire Separation w/ Min.
3/4 HR. F.R.R. Req'd and Proposed
Fire Separation w/ Min.
3/4 HR. F.R.R. T.B.D. at Bldg Permit or T.I. stage
To Conform, To be Shown at Individual
Tenant Improvement Building Permit
Required and Single Stage Provided /
Signal to Fire Dept.
Not Required
45m to Siamese Connection;
45m from Hydrants to Points of Response
To be Determined at T.I. Permit
To be Determined at T.I. Permit
- from H/C parking To H/C Building Access w/ Signage
- to Toilet Room or accessible washrooms
- TBD
TOPOGRAPHIC SURVEY PLAN OF
E 1/2 LOT 2 EXCEPT PART IN PLAN LMP41586
SECTION 20 TOWNSHIP 2 NEW WESTMINSTER
DISTRICT PLAN 15884
Geotechnical Investigation Report
Commercial / Industrial Development
13325- 76 Ave., Surrey, BC
Feb. 181, 2022 / File: 20620
DRAWING
ALL DESIGNS AND OTHER INFORMATION SHOWN HEREON
ARE FOR THE USE OF THIS SPECIFIC PROJECT ONLY AND
SHALL NOT BE USED OTHERWISE WITHOUT
THE WRITTEN PERMISSION FROM THIS OFFICE.
THIS DRAWING MUST NOT BE REPRODUCED WITHOUT
THE WRITTEN PERMISSION FROM THIS OFFICE, AND ALL
REPRODUCTION MUST SHOW THE NAME OF THIS OFFICE.
CONTRACTOR AND SUBCONTRACTORS SHALL VERIFY
AND ARE RESPONSIBLE FOR ALL DIMENSIONS AND
CONDITIONS ON THE JOB. THIS OFFICE MUST BE
INFORMED OF ANY VARIATIONS FROM JOB CONDITIONS,
DIMENSIONS AND CHANGES BETWEEN THIS DRAWING
AND THE WORK.
THE ARCHITECT IS NOT RESPONSIBLE FOR THE METHOD
AND QUALITY OF CONSTRUCTION OF THE CONTRACTOR
AND THE SUBCONTRACTORS.
REVISIONS
PROJECT
PROJECT NO.
SCALE
DATE
DRAWN BY
CHECK BY
SHEET TITLE
AS SHOWN
JHSL
PROJECT BY
BUILDER
AUTHORITY HAVING JURISDICTION
SEAL
2204 NEWT
A 100
NOVEMBER 2022
NOVEMBER 15, 2022
Issued for Discussion
PROJECT
DATA
1 3 3 2 7 - 7 6 A V E N U E , S U R R E Y , B. C.
D e v e l o p m e n t P e r m i t A p p l i c a t i o n
GEOPACIFIC CONSULTANTS LTD.
1779 W.75th Avenue
Vancouver, B.C. V6P 6P2
Ph: 604.439.0922
Fx: 604.439.9189
[email protected]
Attn. Matt Kokan, P.Eng.
Fire Separation w/ Min. 45 min. F.R.R.
to be Provided
Min. 45 min. F.R.R. Req'd if Combustible
(3.2.2.77. more stringent)
N/A
F.R.R. not less than supported assembly Req'd
(3.2.2.77. more stringent)
Min. 45 min. F.R.R. to be Provided
L-1 LANDSCAPE PLAN
L-2 SHRUB PLAN
L-3 LANDSCAPE DETAILS
76 Ave.
Light Industrial Centre
Multi-tenant Development
13327- 76th AVE.
SURREY, B.C.
SITE
KING GEORGE BLVD.
76 AVE.
72 AVE.
NEWTON
ATHLETIC
PARK
132 ST.
128 ST.
SITE
SITE
76 AVE
134 ST.
NEWTON
TRANSIT
BUS DEPOT
Industry - Light Impact (BL 12333; 13916)
means an industrial use which is enclosed within a building
and is not offensive by reason of smoke, vibration, smell,
toxic fumes, electrical or electronic interference and produces
no significant noise which in any way interferes with the use
of any contiguous lot, but excludes salvage industry.
CREUS ENGINEERING
#610- East Tower, 221 Esplanade West
North Vancouver, B.C. V7M 3J3
Ph: 604.987.9070
[email protected]
Attn. Brock Garden EIT
FEBRUARY 8, 2023
Issued for D.P. Application
COVER
LOCATION PLAN & GENERAL NOTES
KEY
KEY PLAN
SERV
SERVICING PLAN
GRAD
GRADING PLAN
R-1
ROADWORKS
DET-1
DETAILS
MARCH 20, 2023
Issued for D.P. Revision
Appendix II
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:451e230d0419f6eeee609987365868e1cf004722c164049d732bb291d12f3992
文本 SHA-256:93f358ae3cc7966c8c3e27916f8c49cb5f41f44ee374899a8bc80c5991520b8f
抽取:pymupdf-1.26.7-text-pages-v1
第 8–8 页;字符 10564–20345(末端不含)