Surrey PLR_7923-0264-00.pdf
这段原文取自本站留存的同一份 PDF,仅展示本条相关文本;官方在线版本可能更新。
Staff Report to Council
Application No.: 7923-0264-00
Planning & Development Report
Page 5
The Temporary Use Permit is proposed to be in effect for three years, which would be
sufficient time for the applicant to complete the sales of the residential units for the proposed
project under Application No. 7923-0013-00. There is potential for renewal should the
temporary real estate sales centre be required beyond that time. A maximum of one renewal
period is permitted for an approved TUP and is subject to Council approval.
Referrals
Engineering:
The Engineering Department has no objection to the project.
Transportation Considerations
Access:
The applicant is proposing to access the subject sites via 133A Street.
Parking:
Rather than capturing gross floor area in accordance with the Zoning Bylaw, concessions to
calculations have been considered given the temporary nature of the proposal. The outdoor
terrace and kitchen have been excluded from the parking calculations. This results in a total
of 8 parking spaces being required for the proposed temporary sales centre/office and eating
establishment. The applicant is proposing to provide 14 parking spaces, exceeding the
requirement.
Parkland and/or Natural Area Considerations
Two class C ditches are identified on the City’s COSMOS mapping system along the 102A
Avenue frontage.
A Qualified Environmental Professional (QEP) attended the site and confirmed that these
ditches do not exist.
POLICY & BY-LAW CONSIDERATIONS
The proposed temporary use supports a higher density development within City Centre by
being the official real estate sales centre for a 42 storey mixed-use tower with a 6-storey
commercial and office podium and 365 residential dwelling units under Application No. 7923-
0013-00. Upon TUP expiry, it is anticipated that the subject site will develop consistent with
the Residential Mid to High Rise 3.5 FAR designation in the City Centre Plan.
PUBLIC ENGAGEMENT
Pre-notification letters were sent on October 21, 2023, and the Development Proposal Signs
were installed on October 25, 2023, Staff received one response from neighboring properties
(staff comments in italics).
非商业公共资料研究与事实报道;仅展示核对事实所需的已评估摘录及本站中文说明。版权归原作者或发布机构;不表示来源机构认可本站。原文、来源及使用条款见链接。 来源使用条款 ↗
打开官方 PDF ↗版本与字符定位
留存文件 SHA-256:5dfcb9e17c8e58e128bdd451f302e05670cc59b5c474a2138ce988fbd4bbc780
文本 SHA-256:3e5340c3da2a7248efd759ff09abd19cc680db1726b43c40eaeaecfaed2060b6
抽取:pymupdf-1.26.7-text-pages-v1
第 5–5 页;字符 6245–8435(末端不含)